From Good to Great: The Evolution of Cutoff Wall Quality Control and Verification Techniques
The last three decades have brought tremendous improvements to quality control (QC) procedures for construction and post-construction verification of deep cutoff walls installed in active high-hazard dams....

70 Years of Soil-Bentonite Slurry Walls: So, What's New
The soil-bentonite slurry wall (SBSW) is an established ground improvement technology that continues to find applications. It�s often the best and most economical vertical barrier to essentially stop lateral...

A Brief History of Jet Grouting in the Last 50 Years: The Story of Its Evolution
Jet grouting, a grouting soil improvement construction technique, was first developed in Japan in the 1960s and 1970s, and then introduced in Europe a few years later in the form of a proposal for soil...

Geotechnical Risk Management: The Five Non-Technical Topics that are Crucial for the Successful Practice of Geotechnical Engineering
It is fair to state that the aspects of civil design and construction referred to as geotechnical engineering can be characterized as inherently risky. Geologic processes are complex,...

Evaluation of Vertica Retaining Wall Systems
Prepared by the Highway Innovative Technology Evaluation Center (HITEC). This report describes a HITEC evaluation designed to determine the basic capabilities...

Journal of Sustainable Water in the Built Environment
The Journal of Sustainable Water in the Built Environment presents activity and research developments in water issues, challenges, and opportunities throughout the developed landscape. The scope covers...

Quality Assurance/Quality Control
The contract between the purchaser and the supplier shall state the responsibilities of each party and the conditions under which the work will be accepted or rejected....

Condition Indices, Performance Measures, and Managing Performance Data for Geotechnical Asset Management � Don't Get Buried!
Why don't transportation agency assets like pavements, bridges, and earthwork have a Check Engine light? Why can't you simply pull up the complete history and life cycle plan for them?...

The Best Surprise is No Surprise: The Geotechnical Engineer's Ethical Responsibility to Say No to Bidding
The subsurface characterization work that a geotechnical engineer must perform is critical to the success of every project that requires the cooperation of the ground, regardless of whether...

Pioneers In Groundwater Session with Christine Shoemaker
Selected in recognition of her contributions to groundwater management and remediation, global optimization, and watershed protection, Christine Shoemaker presents on her experiences and...

Design of Urban Stormwater Controls
Fully updated to address the paradigm shift in the way stormwater is viewed and managed, Design of Urban Stormwater Controls focuses on consolidating technologies to foster a convergence...

Evaluation of the KeySystem II Retaining Wall
By Keystone Retaining Wall Systems, Inc. with TenCate Geosynthetics Geogrid Reinforcement
Prepared by the Highway Innovative Technology Evaluation Center (HITEC). This report describes a HITEC evaluation designed to determine the basic capabilities...

Evaluation of the Stone Strong Gravity Wall System by Stone Strong Systems: Final Report
This report was prepared as part of the HITEC evaluation for earth retaining systems. This evaluation was performed on STONE STRONG gravity walls, a precast modular wall developed, designed,...

Existing Sewer Evaluation and Rehabilitation
Fully revised and updated, this authoritative volume offers the most comprehensive information available on maintenance, repair, rehabilitation, and replacement of existing sewers. This...

Geotechnical Considerations in Grouting Program Planning
This chapter explores geotechnical considerations in grouting program planning. Topics include: basic considerations; geotechnical investigation and geotechnical design summary; grouting...

Field Quality Control
A good quality control program helps ensure that technical requirements of the grouting are met and also adds to the overall success of a grouting project. The quality control program...

Renewal Methods
This chapter presents an overview of different methods that can be used for culvert and storm sewer renewal. For each method, product main characteristics, method description, construction...

Watershed-Based Permitting ? A Myth or Reality?
The United States Environmental Protection Agency has promulgated the Total Maximum Daily Load process to achieve the goals of the Clean Water Act. The TMDL processis applied to water...

Groundwater Flow Model Development at the Nevada Test Site
The Underground Test Area Project (UGTA) of the National Nuclear Security Administration.s Nevada Site Office is in the process of assessing and developing regulatory decision options...

Transport Model Uncertainty and Sensitivity Analysis for Groundwater Releases of Radionuclides from Subsurface Nuclear Tests
Uncertainty analysis of groundwater flow and transport models is a topic of considerable interest in the groundwater modeling communities. The Underground Test Area (UGTA) Project of the...

 

 

 

 

Return to search