Failure of a Twenty-Foot High Retaining Wall
A cantilever retaining wall, designed in apparent accord with provisions in a civil engineering handbook, failed soon after construction. Analyses of the causes of the failure are presented....

Effective Stress Theory of Soil Compaction
The shape of the moisture-density curve obtained from compaction tests has been explained in terms of capillarity and lubrication, viscous water, and physico-chemical interactions. None...

Application of Model Pile Tests to Axial Pile Design
Experiments conducted with instrumented model pile segment probes at Harvey and Empire, Louisiana are summarized and the observed behavior interpreted. Correlations are developed for the...

Sustainable Development — A Geotechnical Perspective
Sustainability has become a key factor in major construction projects these days, and many geotechnical engineers have started focusing on the concept. Owners, public agencies, and the...

Enhanced Detection and Mapping of Buried Utilities—A Sustainability Perspective
The social and environmental impacts and benefits of projects make up the triple bottom line that represents a modern view of sustainable project development. Rather than considering only...

Asset Management of Earth Retaining Structures: Design through Design Life
Regarding new earth retaining structures (ERS) construction, the message is clear: plan for asset management. New construction is certainly not immune to performance issues, and the time...

Beer's Secret Ingredient: geology
As anyone in the beer business should know, water -- and what's in the water, courtesy of the geology through which it percolates -- can make all the difference in an end...

Risk-based Methods for Geotechnical Features in Transportation Asset Management
The purpose of asset management is to meet life cycle performance goals through the management of assets in the most cost-effective manner. In developing risk-based, asset management plans...

So, Why Do You Want to Write a GBR?
Since 1974, scores of papers, articles, conferences, and legal documents have been dedicated to explaining how to write and/or how to use a Geotechnical Baseline Report (GBR). But the...

The Transbay Transit Center: Breaking New Ground in Urban Geotechnics
A building boom centered around the construction of the new Transbay Transit Center (TTC) is transforming the South of Market neighborhood in downtown San Francisco, newly dubbed the Transbay...

Ground Freezing in a Congested Urban Area
Artificial ground freezing is a method of providing temporary earth support and ground water control for deep excavations and tunnels. The technique has been used for over 100 years in...

Support of Excavation Challenges and Solutions at a Manhattan Excavation Site
This article discusses the challenges and alternate solutions encountered in 2012 during support of excavation operations at a medical center project site in Manhattan, NY. The project...

Design-Build and Public-Private Partnerships: Risk Allocation of Subsurface Conditions
Project Owners, especially in the public sector, are exploring and utilizing alternative project delivery methods, such as design-build (D-B) and public-private partnerships (P3s). Some...

Communicating Risk in Geotechnical Engineering Practice
Three project situations are articulated with specific emphasis on an element of uncertainty or risk unique to each....

The Best Surprise is No Surprise: The Geotechnical Engineer's Ethical Responsibility to Say No to Bidding
The subsurface characterization work that a geotechnical engineer must perform is critical to the success of every project that requires the cooperation of the ground, regardless of whether...

The Future of Underground Construction Monitoring
In the past 15 years, the tools and techniques used to monitor the performance of existing ground and surrounding structures during construction have improved significantly. Practice is...

Transbay Transit Center: Innovations in Automated Monitoring
The new Transbay Transit Center will include a multimodal terminal serving 11 transit systems and future high-speed rail from San Francisco to Los Angeles/Anaheim. This is an ambitious,...

Improving Construction Quality by Seeing What's Hidden Underground
One of the challenges of deep foundation projects is the inability to see what's being built at depth. Construction is hidden below ground, in soil or rock conditions that...

Geotechnical Design Over Karst. It's All About the Water
Karst is a type of topography which is formed over soluble rocks, such as limestone, dolomite, or gypsum. An irregular bedrock surface is typical of most karst areas, along with sinkholes,...

Karst-Related Sinkholes: Dynamic Compaction as an Effective Remediation Option
The paramount issue to address before constructing at sites underlain by karst topography is identification and remediation of sinkholes which exist close to the surface, and specifically...

 

 

 

 