Overview of Mathematical Models—River Nile/High Aswan Dam
This paper has been directed towards the presentation of seven reliable planning tools (mathematical models) that can be used for the investigation of the planning options facing policy...

Spillway Gates for the El Naranjero Dam in Spain
In June 1986 Zwag Zschokke Wartmann Ltd received the order from Hidroelectrica Espanola S.A. in Madrid, Spain for the design and model testing of 5 radial gates on the 'El...

Turbulence and Time-Dependent Richardson Number

Vertical Mixing in Thermohaline System

Decoverly Lake—Functional Hydraulics & Aesthetics
The Decoverly Office Park is located in Rockville, MD. In 1984, engineering design on the seven office building park and pond was begun by the consulting engineers. From the beginning,...

Validation and Recent Enhancement of a Three-Dimensional Curvilinear-Grid Finite-Difference Model for Estuarine, Coastal and Lake Circulation: CH3D
This paper describes the validation and recent enchancement of a three-dimensional curvilinear-grid hydrodynamic model: CH3D. The model employs finite-differences techniques and allows...

Great Lakes Waters: Too Little or Too Much?
Water supplies in the Great Lakes Basin, the world's largest fresh water supply, are more than adequate to meet current and projected needs. However, supplies could become...

Estimating Lake Inflows for Storage by Linear Programming
The Lower Colorado River Authority (LCRA) recently completed a Water Management Plan for the lower Colorado River Basin in Texas. In developing the Plan, a daily river flow routing procedure,...

Lake Zephyr Watershed Stormwater Management Plan
Zephyr Creek, located near the City of Zephyrhills in west-central Florida, annually experiences flooding caused by rainfall. Development has encroached into the floodplain causing homes,...

Application of Extreme Value Theory to Great Lakes Rise

Lost Creek Lake Resource Optimization Study

Lake Almanor Cloud Seeding Project

Erosion Control Projects in the Lake Tahoe Basin

Quantitative Evaluation of Reservoir Rule Curves

California-Nevada Interstate Water Allocation

Public Water Supply Versus Wastewater Disposal: Difficult Tradeoffs at Clear Lake, California

Precast Cellular Concrete Breakwater System for Small Harbors

Deep Soil Mixing at the Jackson Lake Dam
The Jackson Lake Dam was constructed in 1917 in the Grand Teton National Park near Jackson, Wyoming. The dam was a hydraulic fill placed on a natural alluvium and outwash foundation. The...

Barrier Islands: Dynamic Coastal Landforms Requiring Complex Management Decisions
Barrier islands and spits are found along ten to twenty percent of the world's coastline, and are the predominant coastal landforms composing about eighty-five percent of...

Longterm Response of Lakes to Acidic Deposition
The longterm response of lakes in the northeastern United States to different levels of acidic deposition was predicted by using a lumped parameter hydrologic/biogeochemical model, the...

 

 

 

 

Return to search