Estimating, Scheduling, and Producing the Manual
Producing an O&M manual can be a challenge. All activities must be coordinated properly and the manual production team must work together to get the job done on time and within...

Runway Capacity Enhancement: FAA's ACE Plan

Evolution and Future of SIMMOD

Scour Evaluations of Existing Bridges

United States Geological Survey Bridge Scour Evaluation Program in Texas

Arizona Local Government Bridge Scour Evaluation Study

Maryland SHA's Procedure for Assessing Existing Bridges for Scour Vulnerability and for Rating Unknown Foundations

Estimating Bridge Scour in New York from Historical U.S. Geological Survey Stream Flow Measurements

U.S. Geological Survey Field Measurements of Pier Scour

Evaluation of an Existing Scour Hole at the Castleton Bridge, A Tidal Crossing

Federal Highway Administration Concept for Designing and Evaluating Tidal Influenced Bridges for Scour

Evaluating Existing Tidal Bridges in Virginia for Scour

Rating Tidal Bridges for Vulnerability to Scour Damage

Equalizing Wet Weather Flows
Sanitary sewer overflows and combined sewer overflows can wreak havoc on communities by flooding basements, contaminating drinking water sources and recreational water bodies, and flowing...

Banking on Bioengineering
Geoenvironmental engineers have traditionally used riprap to protect streambanks and river banks from erosion. In recent years, however, river regulators, permitting agencies, and county...

Holding Court
Contractors had their work cut out for them when structural engineers specified concrete-filled steel tubes for the Thomas F. Eagleton Federal Courthouse's perimeter columns....

Isolating the Arts
The LG Kangnam Building in Seoul, Korea, is a multi-use, 140,000 sq m project, consisting of a 40 story, 183 m tall office tower, an adjacent 9-story acoustically base-isolated performing...

Structural Surgery
Structural engineers had to transform four existing buildings and two new buildings into a new non-profit center for Jewish history. The buildings were of varying ages and had different...

Walled In (Available in Geoenvironmental Special Issue only)
Of the many challenging aspects of the $10.8 billion, 7.5 mi long Central Artery Project in Boston, the construction of soldier pile, tremie concrete (SPTC) walls under the existing elevated...

Design and Construction of the Highest RC Building in Japan

 

 

 

 

Return to search