Longshore Drift Evaluation on a Groyned Shingle Beach Using Field Data

Regional Sediment Management uUing High Density Lidar Data

Risk-Based Corrective Measures for Waste Management Facility Closure
(No paper) In the past several years, risked-based corrective measure has been gradually accepted by federal and state agencies as a standard practice for site remediation or site closure....

Estimation of Peak Flood Discharge for Halilrood Basin, Iran
The peak flood discharge from catchments is one of important information needed for the planning of the water resources projects. In many cases long term data of annual runoff are not...

Basin Response Time: Potential Hydrologic Basin Handprint
Hydrologic lead time is an important factor in many water resources engineering applications. The determination of the response time of a watershed to runoff-producing rainfall is the...

Interface and Data Management for Large Scale Optimization Models
(No paper) This paper presents ideas regarding how different groups of data can be stored and utilized, especially in the context of water resource policy discussions involving different...

Practical Applications of Gage-Adjusted Radar–Rainfall Estimates
(no paper) It is radar's estimates of rainfall at a specific location that tends to disappoint. On the other hand, the strength of rain gage observations is in estimating rainfall at a...

Adjustments to Short-Term Hydrologic Forecasts for Conceptual Models of Hydrologic Processes
(No paper) Real-time forecasting of streamflows is amorphous and multi-dimensional. Weather forecasts, which are synonymous in popular culture with uncertainty, are just one component...

Long-Term Streamflow Forecasting
(No paper) Technology is creating major impacts on water management decisions dynamics. Today emerging technologies, such as satellite rely of hydrological and meteorological data, improvement...

Rising Water and Nitrate Levels within an Alluvial Aquifer near Phoenix, Arizona
(No paper) An analysis of water level data from more than a hundred water supply wells show that water levels have been rising at a considerable rate since 1980 in some portions of the...

Ground-Water Quality in Basins with Minimal Urban Development, Arizona
Ground-water quality data (191796) from 2,013 wells in 16 alluvial basins that have minimal urban development, were used to determine the effect of nonurban factors on ground-water quality...

Geographic Information System (GIS) Characterization of Spatially-Distributed Lifeline Damage

Geo-Engineering for Underground Facilities
The papers collected in this proceedings Geo-Engineering for Underground Facilities, summarize the practice of soil mechanics and engineering...

Moving the Cape Hatteras Light Station: Geotechnical Considerations

GIS Modules and Distributed Models of the Watershed
Prepared by the Task Committee on GIS Modules and Distributed Models of the Watershed of ASCE. This report guides professionals in selecting the mostadvantageous...

High-Tech Highway
The Virginia Dept. of Transportation has spent more than $30 million on the first 2 miles (3.2 km) of the planned 5.7 mile (9.2 km) Smart Road near Roanoke, Virginia. Eventually the road...

Electrical Explorations (Available in Geo-Environmental Special Issue only)
Recent advances in state-of-the-art, relatively fast, two- and three-dimensional electrical resistivity imaging (also called profiling or tomography) have offered a new view on subsurface...

Sinkhole Solution (Available in Geo-Environmental Special Issue only)
In the summer of 1998, a large sinkhole developed overnight in the center of the two-year-old Eagle Ridge Mall in Haines City, FL. The surface depression measured approximately 4.3 m deep...

Special Geotechnical Testing
Central Artery/Tunnel Project in Boston, Massachusetts
The Central Artery/Tunnel Project (CA/T) in Boston, Massachusetts, is the largest urban highway construction project in the history of the interstate system. The magnitude and complexity...

Topographic Surveying
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 29 This manual includes the new electronic surveying...

 

 

 

 

Return to search