Lagging Funds Delay Las Vegas Flood Control Project
Groups to Prevent Flooding in Egypt's Valley of the Kings
Flood Shoal Response to Inlet Modifications at Barnegat Inlet, New Jersey
Infilling Processes, Nature of Littoral Barriers and Stability of Inlets in Spanish Natural Harbours
Abandoned Reclamations as Analogues for Sea Defence Re-Alignment
A GIS-Linked Flood and Erosion Prediction System for Lake Michigan
Development of Baseline Water Quality Stormwater Detention Pond Model for Chesapeake Bay Catchments
Stepwise Flood Routing for Gated Reservoirs and Conjunctive Optimization of Hydroelectricity Income with Flood Losses
A six-stage operation policy for routing of flood hydrographs of return periods from 1.01 year up to the Probable Maximum Flood (PMF) for dams having gated spillways is suggested. The...
Estimation of Peak Flood Discharge for Halilrood Basin, Iran
The peak flood discharge from catchments is one of important information needed for the planning of the water resources projects. In many cases long term data of annual runoff are not...
Determination of Flood Frequency as a Function of Mitigation Expenditure
(No paper) This paper describes an approach to the determination of flood frequency as a function of moneys that could be spent to address a road flooding problem caused by runoff from...
Environmental Restoration and Management of the Tres Rios Demonstration Constructed Wetland Project: Mosquito Monitoring, Control and Management Efforts
(No paper) The Tres Rios Demonstration Constructed Wetland Project in Phoenix, Arizona, is providing valuable information on the role of constructed wetlands in ecosystem restoration,...
Community Participation in the FEMA FIS Process: A New Way to Go
(No paper) As an experienced FEMA Study Contractor (SC), there are numerous items of interest that the community could participate in to facilitate the Flood Insurance Study (FIS) process....
A Leadtime Driven Flood Warning Response Plan Design
(No paper) The paper examines the optimal combination of predictive and detective capabilities in the development of the Wickenburg Flood Response Plan and extrapolates those findings...
Interactive Flood Response Plans: Internet/Intranet Formats with National Implications
(No paper) An effective flood response plan takes into account the needs of and utility to the end user of that plan—namely the local emergency response community. A flood response plan...
Saving San Antonio
During an October 1998 flood, excess flow from the San Antonio River was funneled into a 3.1 mi (5 km) long, 24 ft (7.3 m) wide concrete-lined tunnel beneath the city that emptied into...
Multi-Hazard Risk Assessment for Lifelines, Part 1: Overview and Approach
Catastrophic Risk Financing and Multi-Hazard Study for BC Hydro
Breakup on the Upper St. John River
Abutment Scour at Small, Severely Contracted Bridges
Low-Cost Ice Control Structures for Small Rivers
Return to search