Infilling Processes, Nature of Littoral Barriers and Stability of Inlets in Spanish Natural Harbours
A GIS-Linked Flood and Erosion Prediction System for Lake Michigan
Development of Baseline Water Quality Stormwater Detention Pond Model for Chesapeake Bay Catchments
Watercourse Master Plans: Two Case Studies
(No paper) The State of Arizona recently established statutes (ARS 48-3609.01) that enable local flood control districts to identify sensitive watercourses for floodplain management. The...
Stepwise Flood Routing for Gated Reservoirs and Conjunctive Optimization of Hydroelectricity Income with Flood Losses
A six-stage operation policy for routing of flood hydrographs of return periods from 1.01 year up to the Probable Maximum Flood (PMF) for dams having gated spillways is suggested. The...
Determination of Flood Frequency as a Function of Mitigation Expenditure
(No paper) This paper describes an approach to the determination of flood frequency as a function of moneys that could be spent to address a road flooding problem caused by runoff from...
Adjustments to Short-Term Hydrologic Forecasts for Conceptual Models of Hydrologic Processes
(No paper) Real-time forecasting of streamflows is amorphous and multi-dimensional. Weather forecasts, which are synonymous in popular culture with uncertainty, are just one component...
Community Participation in the FEMA FIS Process: A New Way to Go
(No paper) As an experienced FEMA Study Contractor (SC), there are numerous items of interest that the community could participate in to facilitate the Flood Insurance Study (FIS) process....
A Leadtime Driven Flood Warning Response Plan Design
(No paper) The paper examines the optimal combination of predictive and detective capabilities in the development of the Wickenburg Flood Response Plan and extrapolates those findings...
Multi-Hazard Risk Assessment for Lifelines, Part 1: Overview and Approach
Catastrophic Risk Financing and Multi-Hazard Study for BC Hydro
Breakup on the Upper St. John River
Abutment Scour at Small, Severely Contracted Bridges
Low-Cost Ice Control Structures for Small Rivers
The Effects of Holes Drilled in a River Ice Cover on the Heat Transfer at the Ice/Water Interface
Effect of Multiple Floating Events on a 275 cm (108-inch) Diameter Pipeline
Abandoned Reclamations as Analogues for Sea Defence Re-Alignment
Estimation of Peak Flood Discharge for Halilrood Basin, Iran
The peak flood discharge from catchments is one of important information needed for the planning of the water resources projects. In many cases long term data of annual runoff are not...
Interactive Flood Response Plans: Internet/Intranet Formats with National Implications
(No paper) An effective flood response plan takes into account the needs of and utility to the end user of that plan—namely the local emergency response community. A flood response plan...
Environmental Restoration and Management of the Tres Rios Demonstration Constructed Wetland Project: Mosquito Monitoring, Control and Management Efforts
(No paper) The Tres Rios Demonstration Constructed Wetland Project in Phoenix, Arizona, is providing valuable information on the role of constructed wetlands in ecosystem restoration,...
Return to search