CIVIL ENGINEERING DATABASE
AMERICAN SOCIETY OF CIVIL ENGINEERS                       ASCE LIBRARY

 

Evaluation of New Installations for Concrete Pipe

TRWD Experience with Prestressed Concrete Pipe

Soap Lake Siphon Receives Rehabilitation

Evaluation of Prestressed Concrete Cylinder Pipe in a High Chloride Environment After 19 Years of Service

Effects of Environment on the Durability of Prestressed Concrete Cylinder Pipe

Rehabilitation of 183 cm PCCP with Steel Plate Liners

Overcoming the Challenges of Replacing 20 km of Defective 1524 mm Diameter PCCP

Design and Construction Aspects of the PCCP Water Main Rehabilitation

PCCP Design Check Using C304-92 in a Spreadsheet

Assuring Top Quality Prestressing Wire in PCCP

Advancements in Design and Installation of Prestressed Concrete Cylinder Pipe

Construction Challenges for Soft Ground Tunneling

Condition Assessment and Repair of Prestressed Concrete Pipeline

In-Line Electromagnetic Inspection of PCCP

Internal Inspection and Database Development of PCCP

Sources of Funding for Replacement and/or Repair of Defective PCCP

Practical Repair Procedures for Concrete Pressure Pipe

Lessons Learned about Cured-in-Place Pipe During Construction

Pipeline Market—20 Billion Dollars for 1998: Would You Like Some of This Work?

Pipeline Drainage Discharge Analysis

 

◄ Previous 2 3 4 5 6 [7] 8 9 10 11 12 ... Next ►

 

 

 

Return to search

 

Copyright © 1996 - , American Society of Civil Engineers

Contact Us | Terms | Help | Privacy