From Good to Great: The Evolution of Cutoff Wall Quality Control and Verification Techniques
The last three decades have brought tremendous improvements to quality control (QC) procedures for construction and post-construction verification of deep cutoff walls installed in active high-hazard dams....

A Brief History of Jet Grouting in the Last 50 Years: The Story of Its Evolution
Jet grouting, a grouting soil improvement construction technique, was first developed in Japan in the 1960s and 1970s, and then introduced in Europe a few years later in the form of a proposal for soil...

Reliability-Based Design (RBD) For Everyone: (No Monte Carlo Simulation Required!)
In North America, the design of earth structures for transportation applications is most often carried out using load and resistance factor design (LRFD). In the U.S., the AASHTO LRFD Bridge Design Specifications...

Under-Slab Utility Installation with Aggregate Piers: It's All About Planning
Aggregate pier ground improvement is commonly used in North America to support buildings. The technology has expanded in the last decade thanks to refinement and introduction of new techniques, more rigorous...

What's New in Geo? The Future of Numerical Geo-Modeling: Is 3D Here to Stay?!
Application of soil mechanics in engineering practice has undergone remarkable changes over the past 50 years as a result of developments in computer technology. Each improvement in computing capability,...

Design of Submarine Pipelines Against Upheaval Buckling
This paper describes part of a comprehensive joint-industry project on upheaval buckling. It develops a semi-empirical simplified design method and detailed design methods based on a new numerical analysis,...

ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
he ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering will serve as a medium for dissemination of research findings, best practices and concerns, and for discussion...

Dam Safety Management Using Risk-Informed Decision-Making Methods: A Powerful Tool or an Unnecessary Venture?
This article discusses design standards, safety methods, and risk-informed decision-making methods for dams....

Geotechnical Delivery on Mega Transportation Projects: Challenges of Accelerated Delivery
Transportation projects have traditionally been delivered through the design-bid-build (DBB) delivery model, which continues to be the preferred method of delivering the majority of smaller and more traditional...

Improving Cost and Schedule Performance on Municipal Pipeline Projects: Realizing the Benefits of the Construction Manager at Risk (CMAR) Alternative Project Delivery Method
The water and wastewater infrastructure in the United States is failing. In its 2013 Report Card on American Infrastructure, ASCE stated: "The water and wastewater...

A History of Deep Vibratory Methods for Ground Improvement: A Cost-Effective Foundation Solution for 80+ Years
Deep vibratory ground improvement methods, collectively referred to as vibro systems, have been utilized by the construction community in one form or another for the past 80 years. Development of the equipment,...

Cost Considerations
Cost is an important consideration when comparing microtunneling with other construction methods. Direct costs should not be the only consideration. Microtunneling has other benefits that...

Becoming Greener with Green Sand: An Iron Castings Company Devises an Environmentally Friendly Liner System Reusing Foundry Byproduct
Metalcasting is one of the oldest methods of recycling—humans have a few millennia worth of experience with the technique—but today's industry still battles public preconceptions...

Risk-based Methods for Geotechnical Features in Transportation Asset Management
The purpose of asset management is to meet life cycle performance goals through the management of assets in the most cost-effective manner. In developing risk-based, asset management plans...

The Future of Underground Construction Monitoring
In the past 15 years, the tools and techniques used to monitor the performance of existing ground and surrounding structures during construction have improved significantly. Practice is...

Karst-Related Sinkholes: Dynamic Compaction as an Effective Remediation Option
The paramount issue to address before constructing at sites underlain by karst topography is identification and remediation of sinkholes which exist close to the surface, and specifically...

Interactive Graphics Dynamic Analysis of Frames

Hybrid Modelling of Seismic Structure Interaction

Engineering Approximations for the Dynamic Behavior of Deeply Embedded Foundations

Finite Element Analysis of Complex, Welded Tubular Joints

 

 

 

 

Return to search