Numerical Integration
This chapter discusses numerical integration in Microsoft Excel....

Sensitivity of Raster-Based Model of Hillslope Hydrology and Sediment Transport to DEM Resolution

Driving Characteristics of Open-Toe Piles in Dense Sand

Book Review: Human Resources Management in Construction Projects: Strategic and Operational Approaches by Martin Loosemore, Andrew Dainty, and Helen Lingard. New York: Spon Press, 2003

Book Review: Refabricating Architecture: How Manufacturing Methodologies Are Poised to Transform Building Construction by Stephen Kieran and James Timberlake. New York City: McGraw-Hill, 2004

Book Review: The New Transit Town: Best Practices in Transit-Oriented Development; Refabricating Architecture: How Manufacturing Methodologies Are Poised to Transform Building Construction; Neville on Concrete: An Examination of Issues in Concrete Practice; and Giant telescopes: Astronomical Ambition and the Promise of Technology

Application of TOPNET in the Distributed Model Intercomparison Project (DMIP)
This paper describes the application of a networked version of TOPMODEL, TOPNET, as part of the Distributed Model Intercomparison Project, DMIP. The model implementation is based on a...

A Decision Support System for Drought Management Planning
Traditional drought management planning has focused on curtailment of demand by instituting voluntary or mandatory restrictions on water consumption when regional hydroclimatic indicators...

Frozen Ground Engineering
This new edition gives a peerless presentation of soil mechanics for frozen ground conditions and a variety of frozen ground support systems used on construction project worldwide. An...

Environmental Fluid Mechanics
Theories and Applications
Sponsored by the Fluids Committee of the Engineering Mechanics Division of ASCE. This report provides environmental engineers with a comprehensive...

Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...

Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...

St. George Habor—Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...

Application of Multibeam Echo Sounding and Side Scan Sonar for Mapping of Shoreline Protection Revetments
The use of multibeam survey methodology coupled with high precision positioning systems for the mapping of shoreline protection features and the adjacent offshore areas allows development...

Raising the Bar - 345kV Uprating
The paper presents solutions to increasing the transfer capacity (book rating) of two critical 345kV tie lines. Described are computer modeling techniques using laser survey data coupled...

Finite Element Analysis of Stratified Lake Hydrodynamics

Effect of Aluminum Compression on ACSR Conductor Sags at High Operating Temperatures
Deregulation and restructuring are sweeping the electric utility industry in the United States. As a result, many utility engineers are analyzing, re-rating, and upgrading their most critical...

Multifaceted Trenchless Rehabilitation at the Middletown, Ohio WWTP
This paper describes the multiple trenchless technologies that were evaluated and the ones that were applied to the rehabilitation of a 78la diameter corrugated metal influent line and...

Single-Shell Permanent Lining: Reflections from the Structural Point of View

Post-Peak Analysis of Reinforced Concrete Using Localization Signal

 

 

 

 

Return to search