Dam Rehabilitation and Fish Lift Design at the Pejepscot Hydroelectric Project
The rehabilitation work on the existing rockfilled timber crib dam comprised an assessment of the existing dam stability; analysis of the existing hydraulic conditions to establish the...
The Rehabilitation of Lake Harriet Dam
In 1984, the decision was made to rehabilitate the Lake Harriet Dam. The existing arch dam structure was encased with a rockfill buttress. The downstream buttress, which also acts as a...
Shallow Foundations on Improved Compressible Soils
Air Demand of High Head Sluice Gates: Model-Prototype Comparison
Chute Spillway Aerators ? McPhee Dam Model/Prototype Comparison
Hydraulic Fill Structures - A Perspective
Slopes and Densities of Hydraulically Placed Sands
A Review of Tailings Disposal Practices in North American and Australia
Pneumatic Placement of Mill Tailings at 25 Tons/Hour
Effects of Slurry Backfilling - Lessons Learned
Construction Method for Improving Underwater Sand Fills
Beaching and Permeability Properties of Tailings
Slurry Pipelines: Present and Future
Behavior and Properties of Hydraulic Fills
Report on Session 2 - Material Properties
Geotechnical Properties of Hydraulically Placed Uranium Mill Tailings
In-Place Properties of a Hydraulic Landfill
Downhole Nuclear Density Logging in Sand Tailings
Effect of Gradation and Fines Content on the Undrained Response of Sand
Pore Pressure Buildup and Liquefaction Failure of Anisotropically Consolidated Sand Due to Cyclic Straining
Return to search