Temporary Traffic Deck Over Braced Excavation
A case history is used to examine the planning, design, and installation of a temporary traffic deck over a 23-foot-deep braced excavation. The deck was installed in a three-phase sequence...
Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...
Laboratory and Field Research in Construction Automation
This paper presents a series of research projects to build and test prototype systems. It has been found that prototyping provides an economical approach to support both basic and applied...
Wrapping up Environmental Issues in an Embankment
Contamination on a construction site can lead to increased risk of unanticipated construction delays and increased costs. In response, some owners are opting for proactive approaches to...
Geotechnical and Construction Aspects of the Immersed Tube Tunnel in Boston Harbor
An immersed tube tunnel (ITT) approximately 3,850 feet in length will be constructed as a part of the Central Artery/Tunnel Interstate Highway Project located in Boston, Massachusetts....
Kinematics and Trajectory Planning for Robotic Excavation
One of the high volume and repetitive construction operations at the construction site is the excavation of soil. Automation of the excavation work requires a robotic system that is able...
Determination and Presentation of Subsurface Conditions for Design and Construction
A major problem in the design and construction of many engineering projects is the lack of adequate geotechnical information both for design and for determining conditions to be encountered...
Excavating, OSHA-Style
When the Occupational Safety and Health Administration implemented its new, tougher trenching guidelines in July 1990, the agency opened the door for inventive excavation techniques. Contractors...
The Adoption of Mechanized Excavation Techniques for the Superconducting Super Collider
The Superconducting Super Collider (SSC) is the latest and largest in a line of high-energy physics accelerator projects. The five increasingly energetic accelerators which make up the...
Potholes East Canal Headworks Project
The construction of 6.5 MW Potholes East Canal Headworks in Washington required near vertical excavation of about 100 ft (30 m) through the existing earthfill dam founded on columnar basalt....
Probabilistic Analysis of Soil Structures Using Finite Element Method
The authors have developed general-purpose stochastic finite element analysis system, which supports various types of correlation and computes safety index β by first-order second-moment...
Advances in Trenchless Sewer System Reconstruction
The new developments and refinements in trenchless reconstruction technologies now permit total sewer system rebuilding of collectors, interceptors, manholes, service laterals, and force...
Smoothwall Blasting Planned for the Underground Research Facility at Yucca Mountain
At this time it is not known whether the Exploratory Shaft Facility (ESF) at Yucca Mountain, Nevada will be completely mechanically excavated, completely developed by drilling and blasting...
Preliminary Methodology for Design of Stable Drifts for the Yucca Mountain Project
The Yucca Mountain Project is investigating the feasibility of locating a high-level radioactive nuclear waste repository at Yucca Mountain, Nevada. The conceptual design of the repository...
Reconnaissance δ ¹³C and δ¹8O Data from Trench 14, Busted Butte, and Drill Hole G-4, Yucca Mountain, Nevada Test Site
Trench 14 was excavated to investigate the extent of Quaternary movement on the Bow Ridge fault, a north-south structure on the east side of Yucca Mountain. The trench exposes calcite...
Requirements for Controlling a Repository's Releases of Carbon-14 Dioxide; The High Costs and Negligible Benefits
A repository excavated within the unsaturated zone may release carbon(C)-14 dioxide in amounts that exceed limits imposed by the Environmental Protection Agency (EPA) and the Nuclear Regulatory...
Lunar Surface Mines and Mining Machinery: Design Criteria
Laboratory Research on Lunar Excavation
Force and Geometry Constraints in Robot Excavation
One interest in this research effort was to develop and test an automatic control approach to adjust machine motions to the force conditions encountered during excavation - essentially...
Overview of Earth Retention Systems: 1970-1990
Return to search