Transport and Communications Information System for Africa
The Transport and Communications Information System for Africa (TCISA) is a customized microcomputer-based prototype information system for planning transportation and communications in...
Monthly Water Balance for Blue Nile River Basin in Ethiopia
The objective of this study was to present existing stream flow data for the Blue Nile River and tributaries within the Blue Nile River basin in Ethiopia and to use that data to provide...
Sedimentation Problems and Solutions: Roseires Dam and Reservoir, Sudan
Roseires Dam and reservoir are located in Sudan, Africa on the Blue Nile River. The hydropower from the reservoir provides approximately 80% of the power used in Sudan, thus having a tremendous...
Hydraulic Transient Analysis of High-Head Hydropower Project
An iterative computer simulation procedure called LIQT (Liquid Transient), which performs simulations of hydraulic transients in closed conduit hydro-power systems, is used to estimate...
Transient Analysis of the Finchaa Hydroelectric Project
An iterative computer simulation procedure called LIQT (Liquid Transient), which performs simulations of hydraulic transients in closed conduit hydro-power systems, is used to estimate...
Return to search