Powering Your Electric Vehicle: Affordability Starts with Properly Engineered Geomembrane Liner Systems
Lithium is a vital battery component, and lithium-ion batteries are especially interesting because in addition to being rechargeable, they present a high-energy density and low self-discharge, which means...

Microtunneling Equipment
A discussion of microtunneling equipment in the context of the design aspects of a microtunneling project is applicable only to the extent that the engineer must set forth in the contract...

Machine Performance
Annular Thickness, Annulus, and Annular Space; Overcut; Slurry or Auger System; Cutter Wheel Design and Select; Slurry Separation Plant; Buried Objects and Obstruction; Steering....

Equipment
This chapter examines the types and sizes of equipment required to drill grout holes, proportion and mix grout materials, and deliver and inject grout into the holes in an underground...

Grout Placement Operations
This chapter discusses grout placement operations. The procedures for drilling, proportioning and mixing, and injection used in underground grouting are basically the same as those employed...

Biological Nutrient Removal (BNR) Operation in Wastewater Treatment Plants
Biological Nutrient Removal (BNR) Operation Wastewater Treatment Plants instructs readers in the theory, equipment, and practical techniques needed to optimize BNR in varied environments,...

Micropiles to the Rescue
When a Michigan energy concern began upgrading the equipment in one of its operating power plants, engineers were asked to find an economical and nondisruptive way to support the new loads...

The Road from Kabul to Kandah?r
To have any hope of successfully rebuilding its ware-ravaged economy, Afghanistan will need a reliable transportation infrastructure. Reconstruction this heavily mined highway under a...

Past and Future of Construction Equipment�Part IV
The development of construction equipment has followed the major changes in global transportation. In 1420, Giovanni Fontana was dreaming of and diagramming dredging machines. Development...

Support Equipment
This chapter provides an overview of water and wastewater support equipment. Checklists are included....

Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...

Tunnel with Vision
Two tunnel boring machines that are being used to bore a pair of 6.6 km long tunnels under the Westerschelde estuary in the southern Netherlands must dig through loose sand and sticky...

Transporting Hong Kong
In response to a mobile, rapidly growing population, Hong Kong's Kowloon-Canton Railway Corporation is constructing West Rail, a HK$51.7 billion (U.S.$6.7 billion), 30.5 km...

Preparing for a Slowdown
The economy may not be heading for a downturn, but it is likely to slow in 2001 if early results are any indication. Smaller businesses are often hardest hit by slower growth, but there...

Magnetic Perturbation Imaging for Prestressed Concrete Evaluation
Many prestressed concrete bridge structures in the United States and other parts of the world are over thirty years old and have shown various signs of distress. Corrosion or fracture...

Liner Lessons
The County Sanitation Districts of Los Angeles County comprise 25 independent special districts that cover a service area of approximately 770 sq mi (1,990 km�). Since the early 1990s...

Megaproject Management
By the dredging and landfill project manager for the Port of Los Angeles and Alan E. Alcorn, P.E., an associate vice president of Moffat and Nichol Engineers in Los Angeles. The Pier 400...

Tunneling beneath Cairo
The second phase of the Greater Cairo Metro system in Egypt included many geotechnical challenges. Thirteen kilometers of the 19-km heavy rail line were constructed underground within...

Moving Mountains
The earthmoving and rock-crushing operations at the Eastside Reservoir represented one of the largest such projects in the history of the United States. The earth and rock-fill dams required...

Experimental Approach
One of the best kept secrets during World War II, the K-25 facility in the Cumberland Mountains of East Tennessee prepared uranium for use in nuclear weapons. By 1987, the 13 million sq...

 

 

 

 

Return to search