Atlantic Salmon Smolt Movement and Behavior at Vernon Hydroelectric Station
Behavior of emigrating Atlantic salmon smolts (Salmo salar) was studied at New England Power Company's (NEP) Vernon Hydroelectric Station located on the Connecticut River,...



An Expert System for Control Curve Evaluation During Drought
This paper presents ongoing research into the automation of control curve generation and the development of an expert system for reservoir management for North West Water of Warrington,...

Hydropower Development at North Hartland Lake, Vermont
The purpose of this paper is to give a short history of the first hydropower development by non-Federal interests at a Corps of Engineers flood control dam and reservoir within the jurisdiction...

Evaluation of Air Quality Methods in the Asbestos Work Area
Air monitoring is a technique that is routinely used to measure the level of asbestos in a given airspace. This technique has changed significantly since its first use in the asbestos...

Monitoring the Effects of the Pipe Insertion Machine Technique
The results of an experimental study of the pipe insertion machine are presented in this paper. Strains induced in an adjacent pipeline, soil displacement, pipe deflection and vibrations...

Overview o New England Coastal Flood Study Methodology
This paper presents an overview of the development of methologies used to determine the probabilistic flood levels for New England coastal flood insurance studies. The Federal Insurance...

Restoration of Atlantic Salmon to Maine: Overcoming Physical and Biological Problems in the Estuary
By the early part of the Twentieth Century, all native runs of anadromous Atlantic salmon (Salmo Salar) were extirpated from rivers of the United States, with the exception of a few small...

Nantucket's Broad Creek Opening
On September 20-21, 1961 a severe coastal storm, the remnant of hurricane Esther, formed a 1,200 foot wide, 20 foot deep opening in a barrier beach (Smith's Point at Broad...

Aquatic Dredged Material Disposal in New England
The Disposal Area Monitoring System (DAMOS) is a large multi-disciplinary environmental monitoring program instituted by the New England Division (NED) of the U. S. Army Corps of Engineers...

Resident Only Moorings: A Sign of the Times Or an Endangered Species?
As the demand for mooring space has increased in various coastal harbors throughout New England, many New England coastal communities have enacted legislation giving either explicit or...



Estimating Low-Flow Frequencies of Ungaged Streams in New England
Equations to estimate low flows were developed using multiple-regression analysis with a sample of 48 river basins, which were selected from the U. S. Geological Survey's...

HydroMAX; Computerized Hydropower Scheduling
The New England Power Exchange (NEPEX) is currently using the HydroMAX Program to schedule daily hydropower operations for the 17 stations in the 11,250 square mile Connecticut River Basin....

Wastewater Plant Cold Weather Operational Problems
A questionnaire survey was conducted at biological wastewater treatment facilities in northern New England. Problems associated with various unit processes, due to cold weather operations,...

Evolution of Water Organisations in England and Wales
Although by the early 1960's there was in existence a large body of legislation dealing with water matters, the Water Resources Act 1963 provided for the first time a significent...

Acid Deposition in the Wind River Mountains
National attention has been focused on the discovery of acidified lakes in the Adirondack Mountains of New York and elsewhere in New England. It is commonly believed that the West, in...

Coastal Management Problems in the United Kingdom
Five case-studies from the East coast of England illustrate some of the obstacles facing more enlightened coastal management in the United Kingdom. All the examples demonstrate unsatisfactory...

Dredge Material Evaluation Through Harbor Characterization in New England
The New England Division (NED) of the Corps has recently developed a broad based methodology for simultaneously evaluating dredging projects that are in close proximity and which would...

The Birmingham, England, Airport Maglev Transit Link
This paper outlines the principal design and operating features of the world's first magnetically-levitated transit link which went into public service at Birmingham Airport...

 

 

 

 

Return to search