Database Integration in Support of Construction Management
This presentation will describe how new object-oriented technology is being applied to this problem. The goal of this use of object-oriented systems is 1) to provide a method for processing...
Computer Use in Claims Analysis -- Roundtable Discussion
Preparation or defense of construction claims is inherently time consuming and often counter-productive. This outline discusses some tools currently used in the construction industry to...
CadVisor (CAD Equipment Analysis and Selection System)
This paper describes a system called CadVisor (CAD Equipment Analysis and Selection System) developed by the U.S. Army Corps of Engineers Construction Engineering Research Laboratories...
A GIS Foundation Example
A primary network of geodetic control monuments was developed with static GPS measurements. These monuments are tied to the existing Florida High Precision Network....
Effects of SPT Equipment and Procedures on the Design of Shallow Foundations on Sand
The effect on our computations of bearing capacity and settlement of shallow foundations suggests that as more efficient SPT hammers and procedures are used, our shallow foundation designs...
Evaluating Activated Sludge Secondary Clarifier Performance: A Protocol
To establish a consistent methodology for evaluating secondary clarifier performance, the ASCE Clarifier Research Technical Committee prepared procedural guidelines in the form of a draft...
Sludge Hopper Design for Activated Sludge Clarifiers
Only in the past few years has any attention been allocated to the transport characteristics of sludge collectors. However, no attention has been given to a design rationale for the sludge...
A Computer-Controlled, Precision Pressure Standard
The operating principles as well as the technical aspects of the implementation of a precision pressure standard are presented here. The instrument can have dual use: either as a pressure...
Design and Execution of Hydrodynamic Field Data Collection using Acoustic Doppler Current Profiling Equipment
Proposed major changes to the navigation channel depth in the Cape Fear River prompted an investigation of the existing hydrodynamics of the river system. The observed data are to be used...
Scada System Requirements for Optimum Pumping
In order to minimize the cost of electric energy for pumping water through its distribution system, a computer program was developed to schedule the operation at eight pumping stations...
Integrated Planning for International River Basin
The integrated development of the Vardar/Axios Basin includes a system of projects scheduled to meet the needs and aspirations of Yugoslavia (in particular, the former Socialist Republic...
Effects of Hurricanes Andrew and Iniki on Lifelines
Characterization of Cement-Aggregate Interfaces by Electrical Conductivity Methods
Large-Stone Aggregate-Modified Asphalt Mixes
The Dredging Research Program Technical Area 3
A Method for Rock Dredging Performance Forecasting
Shoals System Capabilities for Hydrographic Surveying
Dredging Equipment, Methods and Contracts
Constructing Beneficial Use Dredged Material Projects
Tonnes Dry Solids Reviewed
Return to search