From Good to Great: The Evolution of Cutoff Wall Quality Control and Verification Techniques
The last three decades have brought tremendous improvements to quality control (QC) procedures for construction and post-construction verification of deep cutoff walls installed in active high-hazard dams....

Working Platforms for Specialty Geo-Construction
A major cause of rigs toppling over is the state of the "working platform" that they must work from. A working platform is a layer of material, often compacted sand or gravel, placed over the subgrade,...

Your Numerical Model Begins at the Site Investigation — Phase Improving the Suitability of Numerical Geotechnical Modeling
The success of an advanced geotechnical numerical analysis depends foremost on a thorough geologic and geotechnical understanding of the site, and thus the geometric definition and adequacy of input parameters...

Moving Down the Road of Progress: Geosynthetics Subdue Failures on Expansive Clays and Frost-susceptible Soils
Using geosynthetics in roadway projects has provided sustainable alternatives for reconstruction and maintenance and now represents a significant portion of the total geosynthetics market. Geosynthetics...

Site Constraints Complicate a Bulkhead Replacement: It Takes a Team to Overcome the Challenges
North American Aggregates (NAA), a leading supplier of aggregates in the New York area, recently constructed a new processing facility in Perth Amboy, NJ. One of the final components of the new facility...

Composite Special Moment Frames
Wide Flange Beam to Concrete-Filled Steel Column Connections
Prepared by the Composite Construction Committee of the Metals Technical Administrative Committee of the Structural Engineering Institute of ASCEComposite Special Moment Frames: Wide Flange Beam to Concrete-Filled...

Highway Embankment Failure on Soft Clay: Bad Input = Bad Output
Our ability to analyze and compute 2D and 3D factors of safety for embankments and slopes, including finite element and finite difference analyses, has increased greatly in the last decade. However, use...

Big Steps for Mankind: Extraterrestrial Sampling and Exploration 50 Years after Apollo 11
Between June 1966 and January 1968, four Surveyor missions successfully landed on the Moon, collecting invaluable scientific data required to support the coming manned Apollo missions. Central to the goals...

Back in Action
At one of Northern Virginia’s most complex and notoriously congested intersections, the superstructure of a critical highway overpass was demolished, removed, and replaced in a single weekend. The design’s...

Rapid Recovery
In May 2017, the California Department of Transportation had to contend with a massive landslide that closed a section of the iconic State Route 1 through central California’s scenic coastal region of...

State of the Practice for Laboratory Testing of Soft Soils: It's All in the Details
As with all material testing, soils testing has undergone dramatic advances in technology because of computer automation. In the 1970s, laboratories were filled with dial gages, proving rings, mercury...

Rock Glue Gets the Job Done: Reducing Rockfall Hazards along the G.W. Parkway
After a large rockfall damaged the road and disrupted traffic along the George Washington Memorial Parkway in 2002, the National Park Service was looking for solutions to stabilize the slope against additional...

The Uselessness of Elephants in Compacting Fill
This article is based on an article that was originally published in the August 1967 Canadian Geotechnical Journal (Vol. IV, Number 3)....

ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
The journal will meet the needs of the researchers and engineers to address risk, disaster and failure-related challenges due to many sources and types of uncertainty in planning, design, analysis, construction,...

Journal of Transportation Engineering, Part B: Pavements
The Journal of Transportation Engineering, Part B: Pavements will contain technical and professional articles on the planning, design, construction, maintenance, and operation of airport, roadway and other...

Cracking the Nuclear Code: Finding an Alternative to the Nuclear Density Gauge
Two of the most basic quality control tests made in the field during soil construction are the soil’s moisture content and density. The establishment of a uniform procedure to compare the performance of...

Geotechnical Delivery on Mega Transportation Projects: Challenges of Accelerated Delivery
Transportation projects have traditionally been delivered through the design-bid-build (DBB) delivery model, which continues to be the preferred method of delivering the majority of smaller and more traditional...

Evaluating Bridges With Unknown Foundations for Susceptibility to Scour: North Carolina Applies Risk-Based Guidelines to Over 3,750 Bridges
Scour occurs when flowing water removes erodible material such as sand and rock. For bridges over water, scour affects the stability of pier and abutment foundations and contributes to...

Geotextile Tube Dewatering
Geotextile tubes are made of high-strength, permeable geotextile that, when filled with a slurry, allow water to drain from the tubes while retaining the solids. They can be prefabricated...

Permeable Interlocking Concrete Pavement (PICP)
Permeable interlocking concrete pavement (PICP) consists of (impervious) manufactured concrete units that form permeable voids and joints, when assembled into a laying pattern. The openings...

 

 

 

 