Irrigation Scheduling with the Neutron Probe
In 1981, the Imperial Irrigation District in cooperation with the United States Bureau of Reclamation started a demonstration irrigation scheduling program on 15,000 acres (6,075 ha)....

Optimization of Irrigation Distribution System Operation
The initial phases of the Federal Central Arizona Project (CAP) are nearing completion and in the latter part of this year the long-awaited delivery of Colorado River water will become...

Water Losses from an Irrigation Canal-Ditch-Dugout System
The general limitations of and requirements for accurate determination of water losses from an irrigation distribution system have been identified. A hydrologic water balance technique...

Foreshore Treatment as a Method of Coastal Protection
This paper describes the damages sustained by a small section of the Vancouver, British Columbia coastline during the passage of a storm in December, 1982. This stretch of protected coastline...

Feasibility Assessment, Planning and Programming of Downtown People Mover Installations
Based on the author's personal experience, this paper sets forth suggested guidelines for progressing from initial feasibility studies through implementation of automated...

How Will People Movers Affect Downtown Areas?
The year 1980 was a pivotal one for the downtown automated people mover development process in both Detroit and Miami. In that year both cities completed their preliminary engineering/environmental...

Planning-Miami Downtown People Mover
This paper presents the Miami Downtown People Mover Story, now officially called METROMOVER. METROMOVER is a fixed, elevated, fully automated people mover, which was developed as a feeder-distributor...

The Planning of an Automated Rapid Transit System in Vancouver
BC Transit is building a 13 mile (22 km) rapid transit line in Vancouver that incorporates Heavy Rapid Transit, Light Rapid Transit and Automated People Mover concepts. The bus sized lightweight...

Status of Tampa's Downtown People Mover
There are currently three People Mover Systems either in the planning stage, construction stage, or operational stage in Tampa. Tampa International Airport has had a Westinghouse Shuttle...

Lille DPM System & VAL Family
This document provides a brief description of the different steps from the beginning to the total completion of the Lille downtown people mover (DPM) program in France. The system performance...

Iterative Design and Evaluation of APM Alternatives
This paper addresses the wide range of cost, performance, and impact criteria which are important in the assessment of automated people-movers in major activity centers. Utilizing a detailed...

Dynamic Simulation of a DPM Auto Intercept System
This paper reports on the application of the UMTA Station Simulation Model (USS), which incorporates a dynamic path-choice algorithm, to model the diversion of motorists to a downtown...

City of Pittsburgh Horizontal Elevator Experience: A Unique Application
The City of Pittsburgh is developing a unique and innovative application of horizontal elevator technology for use as downtown people-movers. The paper reviews the horizontal elevator...

Financing and Implementing Special Assessments
On November 1, 1984 Metropolitan Dade County began levying and collecting a special assessment on 700 properties within the service area of the Downtown Component of Metrorail. Based on...

Value Capture Opportunities for the Proposed Tampa Downtown People Mover

The Miami DPM Procurement Approach

Station Design for Vancouver ALRT
An overview of the fifteen stations in the first phase of Vancouver's new automated light rail transit system is provided. Decisions related to station locations and types,...

Design and Construction of Guideway: Vancouver Advanced Light Rapid Transit
The Vancouver Advanced Light Rapid Transit (ALRT), system consists of linear induction motor driven, light-weight cars automatically controlled operating over a 21. 4 km system from downtown...

Alignment Special Structures for Vancouver's ALRT
This paper describes the special long-span structures, offset columns, and bent structures used in situations where the standardized guideway components used in over 90 percent of the...

Production of Guideway Beams for the Vancouver ALRT
This paper describes the planning, layout and design of a large scale precast plant and innovations in production technology for the fabrication and delivery of 1040 tangent and curved,...

 

 

 

 

Return to search