Golder, Soils Expert, Headed Vancouver Firm

Validation of a Traffic Modeling System for Detour Planning
The Downtown Seattle Transit Project (DSTP) was initiated as an effort to relieve existing traffic congestion in downtown Seattle. It consists primarily of a 1.3-mile electric-bus tunnel...

The Study of Lead in the Water Supply System of Washington, D.C.

Upgrading of the Orange Cove Irrigation District Water Distribution System
The Orange Cove Irrigation District covers about 28,000 Acres in the Central Valley of California. It is supplied from the Friant-Kern Canal. A semi-closed low pressure pipeline system...

Water Quality Criteria for Cyanide in the Similkameen River, British Columbia
The toxicological and environmental significance of the major cyanide compounds is discussed. Data from earlier bioassays studies of cyanide are summarised and the ranges of median lethal...

Iona Outfall Plume Characterization Study
Field studies were conducted in August 1988 to verify the performance of the new deep sea outfall for the Greater Vancouver Regional District (GVRD) Iona Island Sewerage Treatment Plant...

The January 1989 Nestucca Oil Spill on the West Coast of Vancouver Island, British Columbia—Lessons Learned

Subway Design and Construction for the Downtown Seattle Transit Project

People Movers Move Downtown
Although the people mover has become a common sight at major airports in the U.S. and abroad, the sleek high tech vehicles have yet to establish themselves as a cost effective mode of...

Dallas Urban Goods Movement Changes-The Decade After
In the 1970's, the City of Dallas undertook an urban goods movement (UGM) planning project that resulted by the end of the decade in far reaching changes in the process, particularly...

Economic Impact of Alternative Downtown UGM Strategies
In downtown Dallas, four strategies have been tested: consolidated public truck terminals; provision of off-street loading space in individual buildings, under ordinance; curb space management...

Upgraded Irrigation District Water Supply Facilitates Farm and Project Efficiencies

Seismic Design of New Wharf for Squamish Terminals, British Columbia, Canada

Rock Excavations in Downtown Toronto
The geology of Toronto area is somewhat complex due to the series of advances and retreats of the glaciers. The overburden deposits consist of materials laid down during the Wisconsinan...

Coastal Marinas Post-Assessment Study, British Columbia, Canada

Biological Phosphorus Removal Using a Fixed and Suspended Growth Combination: A First Year Appraisal
As an alternative to the activated sludge process for biological phosphorus removal, this paper discusses an alternative which avoids high costs of air supply and large suspended growth...

Aerobic Thermophilic Digestion or Liquid Composting of Municipal Sludges
A study funded by Supply and Services Canada through the Wastewater Technology Center of Environment Canada, and the Province of British Columbia is being undertaken over a two year period...

Decision Support for Short Term Export Sales From a Hydroelectric System
A stochastic dynamic programming (SDP) model was recently developed and implemented at British Columbia Hydro and Power Authority (B.C. Hydro) to provide decision support for short term...

Hydropower Stochastic Forecasting and Optimization
A microcomputer package was implemented to support real-time decisions for weekly and month-end water management at an industrial complex in the mountains of British Columbia. The rolling...

Design, Construction and Testing of Repairs to the Low Level Outlets at Terzaghi Dam
Operation of the low level outlets (LLOs) at Terzaghi Dam in southwestern British Columbia resulted in severe cavitation at operating heads significantly lower than design. Modifications...

 

 

 

 

Return to search