Design of Connections
Bolted connections for transmission structures are normally designed as bearing type connections. It is assumed that bolts connecting one member to another carry the load in the connection...
Structural Members and Connections Used in Foundations
This chapter specifies design procedures for steel members and connections embedded in concrete foundations or the earth. Additional design requirements for structural members and connections...
Scope
This standard guideline covers planning, design, pipe materials, and construction of microtunneling. The term microtunneling is defined as a trenchless construction method for installing...
Detailed Site Investigations
This section addresses site investigation issues that are important for detailed design and construction of microtunneling projects. These site investigations include the following: Geotechnical...
Construction Support Services
A preconstruction survey of existing structures within the anticipated construction zone of influence should be conducted before any construction begins. A plan for structures that need...
As I See It: Enhancing Geotechnical Practice in Support of Performance-Based Design at Ports
Notes on Heavy Lift Design
The interrelated activities and responsibilities of the various organizations involved in the lift design and offshore installation of topside facilities for an offshore platform are discussed....
Findings From a Joint Industry Study on Foundation Fixity of Jackup Units
During the design storm conditions the soil supporting jack-up unit footings may be close to, or at plastic failure. Accordingly, the use of elastic solutions to the problems of foundation...
Extreme Wave-Force Calculation Procedure for 20th Edition of API RP-2A
The paper describes the revised guideline design wave force calculation procedure approved for the 20th edition of the API-RP2A WSD and the first edition of the API-RP2A LRFD and contrasts...
A Simple Model to Predict Soil Resistance to Driving for Long Piles in Deepwater Normally Consolidated Clays
As the exploration and development for offshore oil and gas reserves moves into the deepwater environment of the continental slope, a good model is necessary to evaluate drivability of...
Reauthorization of America COMPETES Act Sows Discord Within House Committee
Study: Solar Power Within The Built Environment Could Exceed California's Energy Needs
Seven Questions: Wisdom and Guidance for Successful Career Building. An interview with Harvey K. Hammond, Jr., P.E., M.ASCE, on the topic of corporate culture
Scotland Yard Interior Transformed, Original Facade Retained
M+, a museum planned for Hong Kong's West Kowloon Cultural District that will be dedicated to the visual arts, will be designed by the Swiss architecture firm Herzog & de Meuron, along with Hong Kong-based TFP Farrells and the Hong Kong office of Arup...
Seven Questions: Wisdom and Guidance for Successful Career Building. An interview with Charles H. Thornton, Ph.D., P.E., Hon.M.ASCE, on the topic of who succeeds and why
The Sequis Centre, Indonesia's first building to be designed with a view to earning platinum certification in the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED) program, is now under construction...
Seven Questions: Wisdom and Guidance for Successful Career Building. An interview with Anthony J. Fasano, Jr., P.E., LEED AP, M.ASCE, on the importance of nontechnical skills in an engineering career
Dutch Museum Extension Adds Modern Twist to Classical Building
Return to search