The Design and Construction of Shuikou Project RCC Diversion Wall
Shuikou Hydroelectric Project, currently under construction on the Minjiang River in the People's Republic of China is a concrete gravity dam having a maximum height of 101...

A Review of Design Criteria for High RCC Dams
The 1980s could be considered to be the decade during which roller-compacted concrete dams came of age. This economic method of construction is sufficiently proven that very large dams...

Performance of Upper Stillwater Dam
Upper Stillwater Dam was constructed with roller compacted concrete (RCC) and horizontally slipformed facing. This unique construction method for a concrete gravity dam included no contraction...

Lessons Learned from Elk Creek Dam
This is the third of a series of papers published on the design and construction of Elk Creek Dam. The first paper discussed design and construction concepts to provide water tightness...

Roller Compacted Concrete Tailing Retention Dam
A roller compacted concrete (RCC) dam has been designed for gold tailing impoundment in southeast Alaska. To minimize up front capital costs, the curved gravity dam with multiple outlet...

Concepcion Dam Design & Construction Problems and Their Solutions
Concepcion Dam is a curved axis gravity structure 68 m high and 695 m long. It supplies water to Tegucigalpa, the capital of Honduras. The dam contains 290,000 cubic meters of RCC. Challenges...

RCC Dam Construction?A Contractor's View
A contractor's view of RCC dam construction is presented. It begins with the principal construction elements and the challenge created by their interrelationships. Men and...

Economic Factors in Roller Compacted Concrete Dam Construction
This paper deals with some of the economic factors that designers and contractors need to consider in the design and execution of an RCC dam. Costs for the RCC portion of the Upper Stillwater...

Mixing and Delivery of Roller Compacted Concrete
Mixing and delivery of RCC are discussed. Both the design aspects such as variability and joint quality, and the construction aspects such as equipment capability and performance are covered....

Construction of Urugua-I RCC Dam
Considerations concerning the RCC construction process and its relation with the design and quality are analyzed. The paper contains topics related to the experience obtained at Urugua-i...

Behavior of Urugua-I Dam
URUGUA-I with its 76 m height is one of the higher lean roller compacted concrete dams. The project includes some outstanding features like the very low cement content and a PVC membrane...

RCC Dam Design Concepts Versus Construction Conditions for Stagecoach Dam
The Stagecoach RCC dam was constructed using current state-of-the-art knowledge and the geotechnical approach to roller compacted concrete (RCC) mix design. The design was prepared in...

Concrete-Faced RCC Dams
In the past 10 years, roller compacted concrete (RCC) has gained wide acceptance as a cost effective material for constructing and rehabilitating dams. Since the first RCC dams had seepage...

Roller Compacted Concrete Mix Design
This paper presents a concise and proven mix design process. It covers all the steps necessary to produce a good roller compacted concrete (RCC) mix design for mass and structural applications,...

RCC Mixes and Properties Using Poor Quality Materials?Concepcion Dam
This paper discusses aggregate studies, mix investigations, and material property tests for the relatively poor quality materials available for use in RCC at Concepcion Dam....

Design of Pena Colorada Tailings Retention Dam
This paper discusses the details involved in the design of a 66 meter high RCC dam to be used to create storage for slurry from an iron ore mining operation located near Manzanillo, Mexico....

Thermal Analysis for RCC?A Practical Approach
Roller compacted concrete (RCC) structures, by nature of the construction method, tend to be monolithic structures or structures with minimal contraction jointing. Recurring questions...

Thermal-Structural Analysis Methods for RCC Dams
Current procedures for evaluating temperature control and the placement of contraction joints in roller compacted concrete dams are not always evaluated with the aid of detailed analysis...

Hydraulics of Stepped Spillways for RCC Dams and Dam Rehabilitations
Stepped spillways are natural extensions of roller-compacted concrete (RCC) placement techniques. Stepped spillways were first used with concrete dams, and designers are eager to use the...

Final Design and Construction of Gibraltar Dam Strengthening
The results of a 1983 safety evaluation of Gibraltar Dam indicated that the dam did not meet seismic safety standards. A remedial scheme involving the addition of a roller compacted concrete...

 

 

 

 

Return to search