Efficient Probabilistic Structural Analysis Using an Advanced Mean Value Method
An advanced mean-value (AMV) method for probabilistic structural analysis is presented. This method blends the conventional mean value method with the advanced structural reliability analysis...

Design/Construct Contract Speeds Bridge Job
In the name of time and money savings, Pennsylvania DOT is building a bridge using a modified turnkey contract. In contrast, the standard approach is first to design the bridge, then ask...

Contract Documents: Lessons from Litigation
Perfect contract documents and a flawless design are uncommon. Given the complexity of many construction projects and the advances in technology, it is not surprising that contract language,...

Impact of International Competitiveness on Construction Technology
Both international and domestic construction markets are changing and forcing changes in construction technology. These proceedings contain six papers from an ASCE technical session on...

Quality in the Constructed Project
A Guideline for Owners, Designers, and Constructors
This book provides guidelines and recommendations for owners, design professionals, and constructors on how to provide quality in constructed projects. Roles, responsibilities, and limits...

Consulting Engineering
A Guide for the Engagement of Engineering Services
ASCE Manual No. 45, Consulting Engineering—A Guide for the Engagement of Engineering Services, outlines the functions of the consulting engineer in serving a client, the types of services...

Innovative Contracting Procedures
The design and construction of the transportation infrastructure is becoming more complex, especially as new products and procedures are becoming available. Some highway agencies are tending...

Overcoming Institutional Barriers to Ground Water Banking: The Kern Water Bank
The newest facility planned for addition to the California State Water Project (SWP) is the Kern Water Bank, a proposed offstream ground water storage and extraction program in Kern County....

McNary Powerhouse Generating Unit 14 Stator Core and Winding Replacement
The powerhouse contains 14 main generating Kaplan-blade units, each rated at 73,684 kVA at 0. 95 power factor. In early 1985 the decision to rewind and uprate Unit 14 was being finalized....

Simply Complex
In California, after years of uncertainties and overcoming a complex myriad of hurdles, a major 205. 5 MW hydroelectric development project, financed by Northern California Power Agency,...

Drilled Piers in the Piedmont—Minimizing Contractor-Engineer-Owner Conflicts
Drilled piers are used extensively in the Piedmont Physiographic Region, deriving support primarily from end-bearing on hard rock. Cost extras and contractor-engineer-owner conflicts are...

Contractual and Legal Considerations With Respect to Temporary Structures

Temporary Structures—The Contractor's Considerations

Barrier Island Reconstruction in Louisiana
The Terrebonne Parish Government reconstructed thirty-eight (38) acres of Eastern Isle Dernieres, a barrier island off the coast of Louisiana, in an effort to retard coastal erosion (Figure...

Emergency Shore Protection
Emergency shore protection usually requires design and construction to be completed in a 2 to 3 week period. Emergency shore protection measures at Surfside and Ventura, California required...

Assessing Changes and Their Real Impact

Methods for Specification and Verification of Hydraulic Design in a Turnkey Construction Contract
The project site is at the Hannibal Locks and Dam at New Martinsville, West Virginia. The existing project, a Corps of Engineers' (Corps) facility built in the 60's...

Feasibility of Weather Modification for California's State Water Project
The California Department of Water Resources (DWR), in the mid 1950's, contracted with some 30 water agencies to eventually furnish about 4. 2 million acre-feet (MAF) of water...

Assessment & Control of Wind Created Risk During Construction
Structures under construction have been damaged by winds. The damaging winds, typically, are much lower than the design wind loads for completed structures. Little guidance is available...

Computers for the Transit Dispatch Office
In 1985 the Transportation Research Board sponsored a report by MacDorman and Associated titled 'Extraboard Management: Procedures and Tools'. The report targeted...

 

 

 

 

Return to search