Underground Concrete Construction
Case Study: Site Characterization Methods in Karst
Folsom East 2 Construction Proving Project: Field Evaluation of Alternative Tunneling Methods in Cobbles and Boulders
Field Measurements during Construction of a Sewage Tunnel
Performance of Multiple Retention Systems during Cut and Cover Tunnel Construction
Design and Construction of a Jet-Grouted Barrier Wall
A Field Observation and Prediction in Soft Ground Tunnel
Shoring for Leslie Station: Design Assessment and Construction Performance
Positioning for Least Cost: Managing Risks in Underground Construction
Removal of Subsurface Obstructions: An Alternative Contractual Approach
Perspectives on Risk Assessment in Tunneling
Modeling the Fate of Dredged Material Placed at an Open Water Disposal SiTe in Upper Chesapeake Bay, USA
Analysis, Design, Construction, and Testing of Deep Foundations
This proceedings,
Materials and Construction
Exploring the Connection
This proceedings,
Assessing Radioactivity at U.S. Department of Energy Sites
Case Studies of Uncertainty Analysis and Explosives Cleanup
Risk Based Corrective Action at a Former Military Site
Risk-Based Corrective Measures for Waste Management Facility Closure
(No paper) In the past several years, risked-based corrective measure has been gradually accepted by federal and state agencies as a standard practice for site remediation or site closure....
Sensitivity of Stormwater Conveyance System Cost to Design Recurrence Interval
(No paper) The cost of a piped and/or swaled stormwater system is determined principally by the storm recurrence interval (e.g., 5-year design storm) used to design it. That is, the present...
Empirically-Based Geotechnical Seismic Site Classification
Return to search