Past and Future of Construction Equipment—Part IV
The development of construction equipment has followed the major changes in global transportation. In 1420, Giovanni Fontana was dreaming of and diagramming dredging machines. Development...
Engineering, Design and Construction of Lunar Bases
How do we begin to expand our civilization to the Moon? What are the technical issues that infrastructural engineers, in particular, must address? This paper has the goal of introducing...
Wood and Wood-Based Materials: Current Status and Future of a Structural Material
Wood is one of the earliest construction materials, and the structural use of wood and wood-based materials continues to steadily increase. In fact, new wood-based materials continue to...
Fiber-Reinforced Polymer Composites for Construction—State-of-the-Art Review
A concise state-of-the-art survey of fiber-reinforced polymer (also known as fiber-reinforced plastic) composites for construction applications in civil engineering is presented. The paper...
Sediment Remediation at the Unnamed Tributary to the Ottawa River
A sediment removal action was conducted in the Unnamed Tributary to the Ottawa River to address sediments containing polychlorinated biphenyls(PCBs) at concentrations up to 74,000 mg/kg....
Frozen Ground Engineering
This new edition gives a peerless presentation of soil mechanics for frozen ground conditions and a variety of frozen ground support systems used on construction project worldwide. An...
A Realistic Vision for the Future of IT in Civil Engineering and a Plan for Achieving It
In October 2001, a group of experts from the capital projects industry met in San Antonio, Texas to begin development of a comprehensive technology research and development (R&D)...
The Role of Pavement Mechanics in the Future of Pavement Design, Construction, Performance, and Management - Opening Address
Measuring Productivity: An Industry Challenge
Is the design and construction industry more productive today than it was a decade ago? Is it matching the achievements in productivity attained by other industries? Are technological...
Mold: A Growth Industry
Failures and Problems with Lift-Slab Construction
This chapter provides an overview of failures and problems with lift-slab construction. Topics include jack systems with inadequate take-up devices; the Canadian wedge connection; Serra...
Developing a Long Term BMP Sampling Program - Initial Results from the Villanova Stormwater Urban Partnership
The Department of Civil and Environmental Engineering has teamed up with the Pennsylvania Department of Environmental Protection to create a directed studies and long term research center...
Use of Industrial By-Products As Geo-Materials
150 Years of Geotechnical Design & Construction
Evaluation of the Tricon Retained Soil Wall System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed to...
Evaluation of the Maccaferri Terramesh System Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...
Berm Breakwaters—Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....
Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...
Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...
St. George Habor—Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...
Return to search