Overview of Research, Evaluation, and Direction of Recycling Technology Projects and Programs Currently Underway at the Federal Highway Administration
Concrete with Recycled Materials as Coarse Aggregates: Shrinkage and Creep Behaviour
High Volume Uses of Coal Combustion Products (CCPs) in Highway Construction
Use of Wisconsin Electric Bottom Ash Sand and Gravel as Sub-Base and Base Material for Rigid and Flexible Pavements and Floors
Performance Evaluation of Pothole Patching Materials
Performance Standard and Testing Protocol for Composite Roadway Covers
Asphalt Quality Control through Compactor Vibratory Responses
Innovative Highway Rehabilitation Construction
Durability of Recycled and Stabilized Pavement Materials
Six Decades of Subway Geo-Engineering: The Interplay of Theory and Practice
Major Sewer Tunnel Construction beneath Metro Tunnels in Singapore
Identifying and Baselining Boulders for Underground Construction
Replacing a Bridge Adjacent to a Deep-Seated Sinkhole in Glacial Deposits
Stability Analyses of Underground Openings Using a Multiaxial Failure Criterion
Analysis of Roof Truss for Underground Support
Finite Element Analysis of Ground Response due to Tunnel Excavation in Soils
Development of Design and Construction Concepts for Jacked Tunnel Sections of I-93/I-90 Interchange Central Artery/Tunnel Project, Boston, MA
Design and Construction of the DART Starter Line Tunnel Contract NC-1B in Dallas, Texas
Underground Concrete Construction
Folsom East 2 Construction Proving Project: Field Evaluation of Alternative Tunneling Methods in Cobbles and Boulders
Return to search