Site Constraints Complicate a Bulkhead Replacement: It Takes a Team to Overcome the Challenges
North American Aggregates (NAA), a leading supplier of aggregates in the New York area, recently constructed a new processing facility in Perth Amboy, NJ. One of the final components of the new facility...
Offshore Technology in Civil Engineering
Hall of Fame Papers: Volume 12
This collection contains five papers of coastal engineering significance that were inducted in 2017 into the Hall of Fame at the Offshore Technology Conference....
Innovative Use of a Groin Structure: Saving Cost, Shortening the Schedule, and Minimizing Impacts
Almost any type of construction activity can pose a shock to the surrounding environment and habitat. Obviously, the extent of the impact will depend on the location of the project and...
Selected Coastal Engineering Papers of Robert L. Wiegel
Civil Engineering Classics
Sponsored by the Coastal Zone Management Committee of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This collection contains 54 papers and...
Floodplain Delineation of the Ranillas Meander in Zaragoza Using GUAD-2D
After the selection of Zaragoza (Spain) as the host city of the International Expo 2008, the
Restoring Coastal Louisiana
Enhancing the Role of Engineering and Science in the Restoration Program
Louisiana's coastal wetlands represent a significant natural and economic resource for the state and the nation but have been disappearing at a rate of 25 to 35 square miles...
Changing Course
Guidelines governing areas subject to 100-year flood consider the expected vertical elevation of floodwaters but overlook the possibility that a river channel may move laterally. A recent...
Breakwaters '99
First International Symposium on Monitoring of Breakwaters
The papers present state-of-art methods and technologies that are used in the structural and environmental monitoring of rubble mound breakwaters. Structural monitoring concerns the structural...
Physical Model of Current-Induced Scour at Ventura Harbor
This paper describes a 1:25-scale movable-bed physical model study of scour resulting from longshore current passing through a narrow gap on the leeside of the detached breakwater at Ventura...
Berm Breakwaters?Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....
Comparison of Hydrodynamic Parameters for a Floating Breakwater
The U. S. Army Engineer Research and Development Center is in the process of developing a Rapidly Installed Breakwater System (RIBS) for use in Joint Logistics Over the Shore Operations...
In Situ Behavior of Breakwaters in Constantza Port?Romania
In order to build breakwaters, especially in the areas with heavy storms, a special analysis on the several factors is necessary. In addition, surveillance of time behavior of breakwaters...
Montioring and Modeling of Tandem Breakwater System at Hammond, IN
A tandem breakwater system was constructed in 1989-90 to provide protection for a large marina at Hammond, IN, at the south end of Lake Michigan. A five year monitoring program (1993-98),...
Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...
Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...
St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...
Applications of Multibeam Echo Sounding with Topographic Mapping for Monitoring of Rubble Mound Breakwaters
Analysis of data from the breakwater monitoring program indicates the integration of multibeam survey capability with the increased accuracy of OTF DGPS positioning and advanced data management...
Application of Multibeam Echo Sounding and Side Scan Sonar for Mapping of Shoreline Protection Revetments
The use of multibeam survey methodology coupled with high precision positioning systems for the mapping of shoreline protection features and the adjacent offshore areas allows development...
Geotechnical Aspects of Beach Restoration
Large-scale beach restoration undertaken by the U.S. Army Corps of Engineers in Florida requires millions of cubic yards of beach quality sand. Exploration for these sand resources starts...
Shoring Up Coastal Engineering
Half of Americans live within 50 mi (80 km) of the coast, although it is becoming increasingly risky and expensive to do so. The importance of ports to the global economy coincides with...
Return to search