Delivering Appropriate Quantities of Water to the Farm
To study how well an irrigation district was able to meet farmer demand, water deliveries along two monitored lateral canals were compared to the orders and bills for these events. The...

An Evaluation of the Large Mammal Entry/Escape Steps Coachella Canal In-Place Lining Project
This study evaluated the effectiveness of a new system of large mammal entry/escape steps as part of the environmental investigations for the Coachella Canal In-place Lining Prototype,...

Stormwater and Sediment Control on the D & R Canal

Concrete Lining the Coachella Canal in the Wet

The Effects of Freshwater Canal Discharges on Salinities in Biscayne National Park

Proposal for Combining Expert Systems and Canal Design
Expert Systems can be combined with a computer aided design methodology to develop a cost effective canal system. The System should consider a feasible set of design alternatives to satisfy...

Aquatic Weed Control by Grass Carp in Cool Water
Diploid grass carp have significantly controlled problem aquatic vegetation during a 3-year study in a northern Colorado irrigation canal where water temperatures ranged from 0 to 25?C....

Graphical Canal Model for System Operators and Planners
Contra Costa Water District operates the Contra Costa Canal, part of California's Central Valley Project. Hydrocomp, Inc. developed an interactive graphical model of the canal...

Jim Falls Hydro Redevelopment Project Construction
The Jim Falls Hydro Redevelopment Project consists of two 28.5 MW vertical Kaplan units in an enclosed powerhouse with an adjacent spillway. The spillway contains three radial gates, each...

The High Line Canal Hydroelectric Project: Micro Hydro for a Macro Utility
The High Line Canal Hydroelectric Project is rated at 530 kilowatts (kW), and features benefits that accrue due to relatively low costs of $2,100 per installed kW, average annual energy...

Protection of Juvenile Anadromous Fish
Protection of juvenile anadromous fish (salmon, steelhead, etc. ) during their seaward migration is a major concern in the Pacific Northwest. The existing screening structures at the head...

Marginal Small Hydro Can be Made Viable
This paper presents the design and construction aspects of a 1,235 kW small hydro power development, comprising a new dam, gated spillway, intake canal, intake, penstock, tunnel, in-ground...

Summer Falls High Head Kaplan Turbine Project
The Summer Falls Project is located on the Main Canal of the Grand Coulee Irrigation Project approximately eight miles south of Coulee City in Grant County, Washington. The power development...

Methods of Evaluating Canal Transmission Losses
This paper discusses various methods presently used to evaluate transmission losses with particular emphasis on those methods used in the Bureau of Reclamation....

Economic Analysis of Canal Animal Protection Measures
Justification of canal animal protection measures has been, to a degree, driven by environmental and social constraints and as a result, large expenditures of funds to protect ungulates...

Proposed Improvements in Lateral Canal Operations
Uniform and flexible supplies of irrigation water are required for farmers to make the best use of their on-farm application systems. Results of a study of deliveries at the lateral canal...

Simulation and Video Animation of Canal Flushing Created by a Tide Gate
A tide-gate algorithm was added to a one-dimensional unsteady flow model that was calibrated, verified, and used to determine the locations of as many as five tide gates that would maximize...

Silt Run Effectiveness in Withdrawing Sediment
An investigation was conducted during the silt runs on the North Platte River to determine the continued effectiveness of the runs in providing fine sediments to the canal systems downstream....

Unsteady Canal Flow?Comparison of Simulations with Field Data

New Lining Method Could Plug Leaks in Canal

 

 

 

 

Return to search