Limitations of Reduced Scale Testing on Parshall Flumes
A model for the boundary layer development in the entrance section of a Parshall flume is developed to account for the effects of fluid viscosity on flume calibration equations. Data for...
The Concept of Local Euler Number as an Aid for Sizing Pitot Tubes
Correlations with drag coefficients enable determining the relations between the form of Pitot tubes and their velocity coefficients. A numerical example is presented to clear the use...
Calibration of Hydrologic and Energy Production Models for High-head Low-flow Hydroelectric Plants
In-Flight Calibration of Mass Spectrometer
A new device for in-flight calibration of mass spectrometer is presented. At a ground station command the calibrator introduces a constant and reproducible amount of deuterium into the...
Calibration of Redundancy Factors for Highway Bridges
The object of this study is to develop a framework for considering redundancy in design and load capacity evaluation of highway bridge superstructures. The proposed method consists of...
Development of the San Fernando Basin Groundwater Flow Model
This paper describes the development and calibration of the San Fernando Basin (SFB) groundwater flow model. The SFB is the largest groundwater basin in the Upper Los Angeles River Area...
Calibration and Validation of the Storm Water Management Model to the Providence Area Combined Sewer System
This paper exemplifies the calibration and validation of the EPA Storm Water Management Model (SWMM) to one drainage area within the Providence (RI) area combined sewer overflow system....
Modeling Stormwater Basin Effects
This paper presents results of an extension to a study included earlier in these proceedings on the downstream accumulation effects of stormwater detention basins. The previously calibrated...
Verification of a 3-D Hydrodynamic Numerical Model
Modeling 70,000 Feet of Interceptor for Aurora, CO
During preliminary design for the City of Aurora's Tollgate Creek Interceptor Sewer Improvements, the authors modeled over 70,000 linear feet of interceptor for both present...
A Comprehensive Algorithm for Network Calibration
An explicit calibration algorithm is proposed which provides the direct and rapid adjustment of the pipe roughness coefficients and junction node demands that exactly meet a specified...
UCD Drag Plate Lysimeter?Momentum and Mass Transfers
The second large (6.1 m dia., 0.97 m deep) lysimeter built at the University of California, Davis (UCD) was largely the brainchild of Dr. F.A. Brooks, the initial Project leader of a U.S....
Hydraulic Weighing Lysimeter Measurement Errors
A prototype size lysimeter was studied in the laboratory to determine accuracy and sources of error that might be caused by variable pillow contact area, temperature changes in various...
Computerized Data Acquisition for an Undergraduate Hydraulics Laboratory
Basic hydraulics principles and the operation of certain hydraulic systems can be effectively demonstrated with the aid of relatively inexpensive data acquisition and analyses systems....
Uncertainty Quantification in Water Distribution Parameter Estimation
Calibration for water distribution system model parameters is usually undertaken with a minimal amount of field measurements so additional pseudomeasurements are assumed. Both the actual...
Calibration of Beni-Mazar Movable Bed Model
A sand-bed model representing a reach of the Nile River was constructed to study alternative solutions to maintaining the navigation channel. Flume tests were carried out first to determine...
In-Situ Calibration of USGS Piezometer Installations
Among the few potentially liquefiable sites around the world that have been permanently instrumented with pore-pressure transducers and accelerometers, only the Wildlife Site in the Imperial...
Traffic Queue Detection Using Image-Processing
A method of queue/congestion detection is described using low cost image processing and computing hardware. It is capable of processing data from a length of roadway within a few seconds,...
Minimizing the Risk of Unsuccessful Modeling Exercises
Monte Carlo simulation techniques were employed to relate input parameter uncertainties to the characteristics of model output accuracy and reliability, and to the probability of successfully...
Calibrating the Chesapeake Bay Water Quality Model
A eutrophication model comprised of twenty-two state variables including three algal groups and multiple species of carbon, nitrogen, phosphorus, and silica is described. Equations governing...