Nonlienar Seismic Response Analysis of Shanghai Yangpu Bridge
The Yangpu Bridge is a long-span composite cable-stayed Bridge in which the superstructures is designed as a floating system to withstand the strong earthquakes. The nonlinear seismic...

Wind Design and Analysis for the Normandy Bridge
The Normandy Bridge will represent an important progress in the field of cable-stayed bridges, with a main span 856-metre long. This paper explains how the design has been oriented to...

A Wind Tunnel Study of an Aeroelastic Model of the Florida Suncoast Dome
Very large scale cable domes have been built using prestressed, high strength steel cable or strand, steel tube columns and a lightweight fiberglass skin. Geiger Engineers Florida Suncoast...

MRT Cable Supported Roof
A cable supported roof structure for Chientan station (R18A) at Taipei Mass Rail Transit system's Tan-Sui line are under construction. Unique wind and cross sectional dynamic effect has...

Superlong Cable-Stayed Bridges
Superlong cable-stayed bridge span is defined as one over 1000 meters. Problems requiring special attention regarding these bridges are discussed, namely: excessive cable sag; high axial...

Design of Stay Cables
Cable stayed structures, consisting of slender superstructure, stay cables and pylons are optimal systems for long span structures with regard to design an economy. The important function...

Parametric Study of Cable-Stayed Bridges Response Due to Traffic-Induced Vibration
The dynamic response of long-span cable-stayed bridges due to moving traffic loads is investigated utilizing three-dimensional models. Modal analysis is conducted using the deformed dead-load...

Buckling of Guyed Towers
The buckling load of a column guyed in a plane by symmetric guy wires is considered. The column is built-in at the ground, supported at the top by guy wires, and is loaded by a vertical...

Ambient Vibration Response of a Long Span Bridge
Natural frequencies, mode shapes and damping characteristics for a long-span cable-stayed bridge were experimentally determined from a series of ambient vibration tests for both the cantilever...

Magnetic Flux Leakage for Bridge Inspection
For many years the Federal Highway Administration and before that the Bureau of Public Roads had focused its nondestructive evaluation program on development of better tools to inspect...

Geothermal and Hydropower Production in Iceland
This paper will first consider the technical aspects of both hydropower and geothermal power production in Iceland. Then the economic consequences of the alternative utilization of these...

A Raft System for Large River Hydraulic Measurements
Collection of hydraulic data in large rivers is a difficult, time consuming, and occasionally perilous task. High water velocities, considerable depths, and wide channels present obstacles...

Computer Analysis of Cable-Stayed & Suspension Bridges
The finite element structural analysis of long span bridges is an area of research that has been studied within the past thirty years since the development and emergence of the digital...

Time-Dependent Nonlinear Analysis of Cable-Supported Prestressed Concrete Bridges
A method of analysis and a computer program CFRAME for the material and geometric nonlinear analysis of cable-supported planar prestressed concrete bridges including the time-dependent...

Non-linear Analysis of a Cable Stayed Bridge
A concrete single-pylon cable-stayed bridge has been analyzed to investigate the ultimate capacity. Two different methods were used to investigate the nonlinear behaviour. First, a simplified...

Computer-Aided Guyed Tower Analysis for the Rehabilitation of TTI Tower, Baltimore
A large guyed television tower owned by Television Tower Inc. of Baltimore is currently being analyzed in order to evaluate the capacity of the tower to support additional broadcasting...

Traffic Signal Management Utilizing Fiber Optic Cable
Fiber optic cable technology has progressed from the pioneer stage and is becoming a widely accepted method of data transmission. Utilization for traffic signal systems, however, is not...

High-Tech Landfill Caps
Just as federal and state regulations detail every aspect of landfill location, construction and operation, they now detail every aspect of its design closure. A typical municipal solid...

Cable-in-Conduit Superconductors for MAGLEV Magnet Systems
A major advantage of using a Nb3Sn Cable-in-Conduit Conductor (CICC) for MAGLEV lies in its demonstrated capability to operate in supercritical helium....

Closing the Loop
The 5.1 mi Cooper River Bridge, the longest in South Carolina, completes the I 526 Mark Clark Expressway around Charleston. It is a two-way, four-lane structure with the capability of...

 

 

 

 

Return to search