When Bridges, Roadways, and Dams Need Our Help: Innovative Techniques Can Help Save Our Nation's Critical Infrastructure
The nation's infrastructure is showing its age. The signs are obvious with structure distress, lack of functionality, and failure reported frequently over the last several decades. Specialty geotechnical...

NTSB Issues Preliminary Report on Florida Bridge Collapse (part of Infrastructure Solutions: Bridges Move Forward)
In late May, the National Transportation Safety Board (NTSB) released its preliminary report about the March 15 structural failure and collapose of a partially-constructed pedestrian bridge in Miami....

ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
The journal will meet the needs of the researchers and engineers to address risk, disaster and failure-related challenges due to many sources and types of uncertainty in planning, design, analysis, construction,...

ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
he ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering will serve as a medium for dissemination of research findings, best practices and concerns, and for discussion...

Risky Business: Identifying an Acceptable Rockfall Standard
For many parts of the U.S. highway system, cut slopes in rock are as common as bridges and embankments. These cut slopes, as well as some natural ones, produce rockfalls that pose risks to highway conditions...

Rock Glue Gets the Job Done: Reducing Rockfall Hazards along the G.W. Parkway
After a large rockfall damaged the road and disrupted traffic along the George Washington Memorial Parkway in 2002, the National Park Service was looking for solutions to stabilize the slope against additional...

A Sunken Submarine Full of Mercury: Safe, Controlled Construction of a Counter Fill for Seabed Slope Stabilization at about 155 to 177 Meters
On December 5, 1944, with World War II still raging and peace in Europe still six months away, the German submarine U-864 set out on her maiden voyage on a secret mission to deliver strategic war supplies...

Eyes in the Heavens: Satellite Technologies in Remote Site Monitoring
Installation and maintenance of instrumentation to monitor geotechnical projects in remote locales is usually more challenging than sites in urban areas for both technical and logistical reasons. In most...

Difficult-Access Rockfall Mitigation: Design and Construction Way Up High!
Rockfall mitigation projects frequently require work at elevated positions. This is not something that comes naturally for many engineers and geologists. Palms sweat, knees knock, and voices may start...

Design of Submarine Pipelines Against Upheaval Buckling
This paper describes part of a comprehensive joint-industry project on upheaval buckling. It develops a semi-empirical simplified design method and detailed design methods based on a new numerical analysis,...

Appraisal of Lightweight Moorings for Deep Water
This paper outlines the potential advantages of using lightweight fiber ropes for mooring floating production platforms. The influence of tether properties on mooring system response is discussed. It is...

Fire in the Hole: Emergency Repairs to the Robinson Creek Tunnel
On the eve of April 26, 2014, an arsonist set fire to the CSX Transportation (CSXT) Robinson Creek tunnel. The tunnel is located about 120 mi. southeast of Lexington, near Pikeville, KY. The 742-ft-long...

Railroad Tunnel Clearance Improvement and Linear Replacement: What Happens with Unexpected Ground Conditions during Tunnel Construction?
To increase the capacity and efficiency of transporting waste by rail to an existing landfill, Enviro Solutions Inc., the landfill owner, and CSX Transportation (CSXT), the rail line owner, sought the...

Railway Geotechnical Asset Management in Great Britain: How Modern-Day Techniques Help Monitor Railway Infrastructure Dating to the 1800s
This article discusses asset management, risk management, and earthworks failures as experienced by Network Rail (NR), the owner, operator, and asset manager of the majority of the rail network of Great...

What Does the Crystal Ball Say? Energy and Water Issues Are Too Great to Ignore!
Over the past 15 years, the Geoprofessional Business Association's (GBA) Emerging Issues and Trends Committee has held a series of Crystal Ball Workshops (Workshops) to identify long-term emerging issues...

Restoring Steinbeck's Carmel River: The Removal of San Clemente Dam
If you've read John Steinbeck's 1945 classic "Cannery Row," then you're already familiar with the Carmel River, which he described as "…a lovely little river. It isn't very long, but in its course it has...

Whose "Fault" Is This? Overcoming Faulting and Ancient Landslides in a Dam Abutment
The Calaveras Dam Replacement Project (CDRP) is the largest project in the San Francisco Public Utilities Commission's (SFPUC) $4.8 billion, multi-year Water System Improvement Program (WSIP). The program...

Dam Safety Management Using Risk-Informed Decision-Making Methods: A Powerful Tool or an Unnecessary Venture?
This article discusses design standards, safety methods, and risk-informed decision-making methods for dams....

The Case for Tolerable Risk Guidelines to Manage Flood Risk: Nature Bats Last
Since ancient times, people have used levees to reduce flood risk. We have built over 30,000 miles of levees in the U.S., largely on the belief that levies will unconditionally protect people who live...

Tailings Dam Engineer of Record (EoR): There's Nothing Conventional About It
Engineer of Record (EoR) is a simple and resolute concept that's applied throughout the western world for civil works construction. It's a term that fits in a nice neat box; it represents a single person...

 

 

 

 

Return to search