To Filter or Not To Filter: Boston's Two Track Approach to Compliance With the SDWA
Planning and Design of the MetroWest Water Supply Tunnel for the Boston Region
Leaking Plumbing Fixtures and Water Conservation
Living Within Our Means: A Successful Demand-side Water Resources Plan for Boston
Case Study: Design Considerations for the St. James Avenue Sewer Restoration in Boston
Marine Construction of the Boston Outfall
Partnering: An Innovation to Improved Infrastructure
A Test Program to Verify Grouting Effectiveness for Boston's Central Artery/Tunnel Project
Central Artery/Tunnel Project, Boston: Mitigation Does Work
Boston's Commuter Comeback
More than 30 years after its abandonment, the Old Colony Railroad in Massachusetts is being revived through a �480 million rehabilitation project to serve residents southeast of Boston....
Case Study - Performance of Diaphragm Walls During Construction; Predictions vs. Field Measurements
Rigid diaphragm walls (slurry walls) are being used more than any other earth supporting system for underground construction projects in confined downtown sites throughout the United States...
Lateral Load Resisting Systems for Circular Buildings
The design of structural systems to economically limit inter-story drift and building acceleration for circular high rise buildings is presented within the framework of two recently constructed...
Boston's Backup Water Supply
For fifty years, Boston's sole real source of water has been the Hultman Aqueduct, but now final design is almost complete on the MetroWest Supply Tunnel, a new, larger conduit...
Boston and San Francisco Groups are Management Stars
Climate Change Impacts on Boston's Water Supply
The analysis of the climate sensitivity of the water supply system of the Boston area indicates that the water supply has the potential to be dramatically altered by global warming. The...
Stress-Deformation Behavior of an Embankment on Boston Blue Clay
An 11 m high I-95 embankment was thoroughly instrumented with piezometers, settlement rods and inclinometers to measure the behavior of the underlying 40 m thick deposit of Boston Blue...
Control of Odor and VOC Emissions at Wastewater Treatment Plants -Boston Harbor Case Study-
Siting of the new wastewater treatment plant (WWTP) for the Massachusetts Water Resources Authority (MWRA) in Boston was based on an assumption of mitigation of total reduced sulfur (TRS)...
Rehabilitation of Belle Isle Siphon in Boston, Massachusetts
Environmental Monitoring and Mitigation: Harbor Tunnel Dredging and Disposal Operations, Boston, Massachusetts
Computer Applications on the Central Artery/Tunnel Project
Boston's Central Artery/Tunnel (CA/T) project consists of the reconstruction of a 4.2 mile segment of Interstate Route 93 in downtown Boston, a 3.3 mile extension of Interstate Route 90...
Return to search