Probabilistic Analyses of Port Throughput and Berth Optimization

Low Cost Modernization of a Container Berth: Conley Terminal Berth 11

Seismic Design of Port of Los Angeles Berth 144 Wharf

Use of Temperature & Velocity Correction Factors in Establishing Marine Fender Performance

Feasibility Study for Homeporting of Nimitz Class Aircraft Carriers

Navigating the Planning and Implementation Efforts of a Dredging Project Amidst the Myriad of Local, State and Federal Bureacratic Floating Mines

Rehabilitation of a Berthing Structure

Cyclopean Seawall Repair and Berth Deepening 10th Avenue Marine Terminal, San Diego, California

Development of the Proposed Pier T Container Terminal at the Port of Long Beach, California

A Pier to Moor ARDM-1 Floating Drydock, New London

Design/Build Success Tampa Port Authority Berth 208

Cellular Cofferdam Wharf Extension for PORT

Navy Submarine Wharf Design, Pearl Harbor

Fender Systems in the 90's and Beyond

Risk Design of Dolphin and Fender Systems

Modernization of Ferry Terminals State of Maine Department of Transportation

Signing Systems: Directional, Identity, and Graphic Systems for the Port of Long Beach
The authors have developed (in conjunction with Port staff) a revolutionary roadside communication system for The Port of Long Beach. The system includes: Renamed piers for easier understanding...

Port of Portland's Berth 601 Floating Dock
The Port of Portland's facilities, being located on the Columbia and Willamette Rivers, are subjected to extreme water level fluctuations. Over the years, the Port has used floating docks...

Model Tests for Expansion of Anaheim Bay Naval Harbor
Modifications to the Anaheim Bay, California, Harbor complex have been proposed to enable larger ships to access the existing wharf for direct loading of ordnance. In addition, new deepwater...

Honolulu Harbor Ship Traffic Simulation and Animation Study
A computer simulation and animation study was conducted to investigate the operational impacts of projected ship traffic increases and harbor reconfiguration specified in the Honolulu...

 

 

 

 

Return to search