Mercedes-Benz Stadium and Its Unique Camera Aperture-style Retractable Roof: A Collaborative Approach to Myriad Foundation Support Systems
The multiuse Mercedes-Benz Stadium, home to the NFL�s Atlanta Falcons and MLS�s Atlanta United soccer teams, opened in 2017 and is used as a sports facility and major entertainment venue (Figure 1). With...

Resolving the Water Wars: The Compacts Between Alabama, Florida, and Georgia
(No paper) Several water supply proposals on behalf of Georgia have caused a water rights ?war? which pits Alabama and Florida against Georgia in the Apalachicola, Chattahoochee, and Flint...

One Peachtree Center: Atlanta Georgia
Presented in this paper are the architectural and structural concepts of One Peachtree Center built in the city of Atlanta. This 62-story tall building has changed the downtown skyline...

One Ninety One Peachtree and NationsBank: Composite Additions to the Atlanta Skyline
The structural design of two composite buildings in Atlanta is described in this paper. A composite exterior partial tube was used in one case and a composite super-column system was utilized...

Recreating a Process: The West Georgia Regional Water Supply Plan
This paper describes the planning process used to develop a long-range water supply plan for a five-county area northwest of Atlanta, Georgia. Demand for water in the study area is projected...

Data Capture with GPS for Sewer Map Updates
The Cobb County Water System in suburban Atlanta, Georgia selected RJN Environmental Associates, Inc. to provide infiltration and inflow (I/I) source detection and mapping services in...

Spatial, Lattice and Tension Structures
This proceedings, Spatial, Lattice and Tension Structures, contains over 100 papers presented at the IASS-ASCE International Symposium 1994,...

Site Traffic Impact Analysis Process: The Developer's Perspective
Site traffic impact analyses are often conducted for private developers by traffic engineering consultants to be reviewed by the local engineering or planning departments of Cities and...

The Changing Alliance Between Navigational and Environmental Interests in the ACF Basin
Structural modifications imposed on the Apalachi-cola River for navigation, their environmental impacts and government actions to address these impacts are reviewed. Past structural modifications...

Allocating Chattahoochee River Water Rights
Recent proposals to reallocate Chattahoochee River waters to provide water supply for Atlanta, Georgia have caused great concern to downstream users in Alabama, Florida and Georgia. A...

Utility System Demand Forecasting Using Land Use Coefficients
In rapidly changing areas where several divergent paths of future growth are possible, there are advantages to forecasting future water demands and wastewater flows using the water and...

Southeastern Drought of 1988?A Federal Perspective
The drought that has plagued the Southeastern United States for most of the 1980's is continuing in two major river basins within the geographic boundaries of the South Atlantic...

Storage Reallocation in Hydropower Projects of North Georgia
Over the past 40 years, the Corps of Engineers has built nine multiple purpose storage projects in Georgia, with hydroelectric power production as a major purpose. Six of the projects...

Simulation of Long Period Ground Motions for a Large New Madrid Earthquake
Ground motions for a large New Madrid earthquake are simulated to provide response spectra in the period range of 0.5-20 seconds for hard rock sites at Chicago and Atlanta. The ground...

Use of the DEB Model in MARTA's Service Planning
The Metropolitan Atlanta Rapid Transit Authority (MARTA) is in the process of expanding bus and rail services. The expansion program requires the preparation of annual and five year system...

Managing Major Transit Construction Projects
Building rapid transit systems is a regular and ongoing world wide occurrence. However, for cities initiating first time transit system development it is truly a unique experience. Initiating...

Rail Transit Construction Readiness: The Evolving MARTA Organization
A rail transit project is a complex undertaking involving thousands of people, expending millions of dollars and ultimately taking years to accomplish. The Metropolitan Atlanta Rapid Transit...

Maintenance Requirements of People Mover Systems
The Atlanta Airport Automated Guideway Transit System is comparable to the second or third busiest transit line in the US. The key quality indicators of system performance are discussed...

Structural Integrity Assessment of the Flexible 870 Advanced Design Bus
The Grumman Flxible 870, a lightweight advanced design urban bus, entered service in Atlanta, GA in 1978, and some 2,800 of these buses were in service nationwide by 1980. In the autumn...

Tunnelling in Soil and Rock
The relationship between tunnel design and construction is covered with emphasis on case histories of field measurements and performance. A general report emphasizes the importance of...

 

 

 

 

Return to search