Case Study ? Elliott Bay Marina Floating Moorage
The recently completed Elliott Bay Marina project in Seattle is one of the larger projects of this type in the country, with 1196 slips ranging from 32 feet to 60 feet, a floating fuel...

Design of Marina Replacement Facilities
A majority of the waterfront design projects within the State of California are for the replacement of existing facilities since the densely populated shoreline areas are already heavily...

Soil Contamination Issues at Port Marine Terminals
A preliminary survey of hydrocarbon contaminated soil and groundwater problems in U.S. west coast ports indicates that the problem occurs in most major port areas. Using the Port of Los...

Clean-Up of Contaminated Soils: A Necessary First Step in Industrial Land Redevelopment
This is a paper describing efforts by The Toronto Harbour Commissioners to demonstrate how several technologies can be effectively integrated to remove or reduce contaminant levels in...

Securing Strategic National Security Objectives Through Maritime Activities
The President's national security strategy envisions a healthy and growing economy, wise environmental stewardship and a strong military as part of his plan to meet and to fulfill the...

Pile Lateral Load Test in the Port of Los Angeles
Recent wharf projects in West Coast ports have featured rock dikes to contain backland fill and the use of vertical piles embedded in the rock dikes to resist lateral loads. This paper...

Batter Piles and the Seismic Performance of Pile-Supported Wharves
This paper discusses the role of batter piles in the seismic performance of wharves, based on the results of a nonlinear soil-structure interaction analysis of a pile-supported wharf with...

Pile Driving: Can it Cause Slope Movement?
The potential for slope movement from pile driving is examined in this paper. Published information is reviewed to identify the primary causes of movement, which are 1) displacement of...

Riprap Design in Marine Terminals
Navigation vessels in otherwise quiescent waterways sometimes generate forces that require stabilization of the bed or banks. Since riprap is an accepted and dependable means to armor...

Measured Fill Performance at Berths 212-215 in the Port of Los Angeles
This paper summarizes the performance of an instrumentation fill constructed in open water in the Port of Los Angeles (Port). A new container-handling facility was constructed that consisted...

Non-Intrusive Rayleigh Wave Measurement System for Soil Profiling in Ports
Accurate shear wave velocity profiles have been long recognized as essential data to evaluate the dynamic response of soil deposits and soil-structure interaction under earthquake and...

Proposed Seismic Design Method for Piers and Wharves
Current seismic provisions of the 1991 Uniform Building Code (UBC-91) and the 1983 AASHTO Seismic Design Specifications (AASHTO) are compared as they relate to piers and wharves. An alternate...

Seismic Rehabilitation of Seattle's Pier 69
The Port of Seattle, one of the largest on the west coast of North America, made a strong statement regarding their support for reusing existing structures when a decision was made to...

Earthquake Damage Repair and Retrofit of the Seventh St. Terminal Port of Oakland
The October 17, 1989 earthquake resulted in the collapse of the two-level Cypress St. Freeway in Oakland. Television and newspaper coverage revealed the tragic loss of life and property...

Dredging Contaminated Sediments: A Monitoring Plan for Boston Harbor
Dredging and blasting will be conducted in Boston's Inner Harbor over approximately a one-year period during construction of the Third Harbor Tunnel. The silty organic surface sediments...

Seismic Survey Considerations in the Planning and Design of Dredging Projects for Marine Terminal Facilities
This paper presents a case study of the value of high resolution seismic survey information when planning and designing a dredging project for a marine terminal facility. Advances in high...

Analysis of Dredged Material Deposition Patterns
Between November 1, 1989 and 30 March, 1990, nearly 1 million cubic yards of dredged material were disposed in Puget Sound as the first phase (Element I) of the construction of the Navy's...

A Computational Berthing Model for the Design of Fender Systems
The IRF numerical model has not been widely applied to the design of fender systems although the method has been extensively confirmed by hydraulic model tests and partially verified by...

Design Criteria for Ferry Landings
This paper describes an ongoing research project conducted by the University of Washington Department of Civil Engineering to develop design criteria for the Washington State Ferry System....

A Removable Submarine Cover for Drydock No. 2 Modernization
In order to provide balanced overhaul capability and flexibility in the 1990's and beyond, the Portsmouth Naval Shipyard in Kittery Maine, a major U.S. Navy submarine and overhaul repair...

 

 

 

 