Lessons from Dam Incidents. US-II
The purpose of this report is to present available data to the profession regarding failures, accidents, and major repairs at dams in the United States. Data is analyzed with respect to...

Transit Triumph
The 1988 Outstanding Civil Engineering Achievement is Boston's Southwest Corridor, chosen not only for its size, complexity and technology, but for its environmental, public...

Guide for Design of Steel Transmission Towers
ASCE Manual 52, Guide for Design of Steel Transmission Towers, serves as a basis for the design of both guyed and self-supporting steel transmission...

The Eccentric Entrance
Architects design irregularly shaped buildings to give their clients something different, and this creates problems for structural engineers, especially in earthquake zones. The Brinderson...

Long Distance Dam Data
Remote data collection systems are increasingly being used for dams. Instrumentation of structures for obtaining data on performance is not new. However, automation and computerization...

Leakproofing an RCC dam
A roller compacted concrete dam, Stacy Dam in Texas, is described and several methods of preventing leakage are mentioned. Reinforced concrete facings, placed after RCC completion, was...

Seismic Cutoff
The John Hart Dam, which is a 40-year old dam in British Vancouver, Canada, has been rehabilitated to meet current seismic codes. BC Hydro, the utility that owns the dam, conducted a study...

Conjunctive Use in the Niles Cone, California
The use of in-stream facilities for artificial recharge in stream channels as practiced in Alameda County, California, is discussed. The facilities are (1) stream channels with no other...

Techniques of Artificial Recharge from an Ephemeral Wadi Channel Under Extreme Arid Conditions
A series of field experiments and theoretical analysis was carried out for the alluvial system in Wadi Tabalah in order to determine the feasibility of implementing artificial recharge...

Review of the Nation's Water Resources Infrastructure Needs
Also published in Critical Water Issues and Computer Applications...

Barge Bottleneck Uncorked
Construction of the replacement Lock & Dam 26, on Mississippi River at Alton, Ill. near St. Louis, is described. The $1 billion job, programmed to be built over the period 1979-91,...

Should Fast Track be Derailed?
Engineers, architects and owners believe that fast track construction is a great idea when it works, but serious problems can arise. Some engineers feel that the owner reaps all the benefits...

Geotechnical Notes on the Effects of Mexico's 1985 Earthquakes
The present notes briefly describe the most relevant effects of the September 19 and 20, 1985 earthquakes on shallow and deep foundations used in Mexico City, which is located at about...

Effects of the 1985 Earthquake in Lazaro Cardenas, Mich.
An account is presented of a geotechnical survey made shortly after the major earthquake of September 19, 1985 (magnitude 8. 1) at the industrial port of Lazaro Cardenas in the state of...

Earthquake Response of La Villita Dam
Due to the recent industrial and housing developments at the port of Lazaro Cardenas, located 13 km (8 miles) downstream of La Villita Dam, at the mouth of the Balsas River, the hazard...

Analyses of Foundation Failures
During the earthquake of September 19th, 1985, many buildings tilted and underwent settlements, sometimes of very large magnitudes. This paper describes and analyzes these settlements....

Soil-Structure Interaction in Mexico City During the 1985 Earthquakes
The effects of the flexibility of the soil and the foundation on the seismic response of structures, by opposition to clear foundation failures, cannot be easily identified from a simple...

Seismic Design Criteria for Foundations on Control Piles
Control piles have been widely used in Mexico City for underpinning buildings with excessive settlements caused by the consolidation of the soft clay deposits, and as a foundation solution...

Summary of the Effects of the 1985 Mexico Earthquake to Power and Industrial Facilities
A major industrial area and two power plants are near the epicenter of the Magnitude 8. 1 Mexico Earthquake of September 19, 1985. All investigated facilities are modern, generally well...

Stopping Seepage
The Navajo Dam in New Mexico has major seepage problems. The Bureau of Reclamation, which owns the Dam, conducted studies, verified by outside consultants, concluding that the combination...

 

 

 

 