Water for Ahwatukee
Scheduled for completion in August, the South Mountain Water Facilities pipeline will increase drinking water capacity to the community of Ahwatukee Foothills, a rapidly growing south...

Preserving Pisa's Treasure
Pisa's bell tower, a prime example of Romanesque architecture, would be renowned even if it did not lean. Construction of the tower began in 1173 and was not completed until...

The Submarine Mission
A new Navy engineering and support facility for submarines has been designed and constructed at Lake Pend Oreille, near Bayview, Idaho. The project includes a bridge approach to the facility,...

Metamorphosis
Ranked as one of the 15 tallest buildings in New York, the headquarters of the Bear Stearns Companies, Inc., is a 45-story skyscraper that is 815 ft (248 m) tall. Replacing an existing...

Deep Freeze
In engineering, overcoming a failure can sometimes be more instructive than completing a project with unqualified success. Such was the case with the collapse and repair of a force main...

Twin Crossings
The Hungerford Bridge actually comprises twin pedestrian bridges that are being constructed on either side of an operational 19th century railway bridge over the River Thames in London....

Winning Combination
The complex, 4.1-mi (6.6-km) long Richmond-San Rafael Bridge across San Francisco Bay is being upgraded as part of California's $2.5-billion program for seismically retrofitting...

The Excavation
As the largest, most emotionally charged deconstruction effort ever undertaken in the United States comes to a close, the World Trade Center has been reduced to what it was 35 years ago:...

Countering Chemical and Biological Terrorism
Prior to the terrorist attacks of September 11, building protection related to terrorism primarily focused on the threat of bombs detonated inside vechicles. However the September 2001...

The Chernobyl Problem
When the infamous accident at the Chernobyl Nuclear Power Plant occurred in April 1986�a catastrophe that involved an explosion that blew off the top of one of the plant's...

Dissecting the Collapses
The September 11 terrorist attacks on the World Trade Center horrified the civilized world. An estimated 2,830 human lives were extinguished by these attacks. In the aftermath of the events,...

The Education of Gerry Schwartz
During a career spanning more than three decades, ASCE's current president, H. Gerard Schwartz, Jr., has learned that the true measure of success is service to one's...

Physical Model of Current-Induced Scour at Ventura Harbor
This paper describes a 1:25-scale movable-bed physical model study of scour resulting from longshore current passing through a narrow gap on the leeside of the detached breakwater at Ventura...

Berm Breakwaters?Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....

Comparison of Hydrodynamic Parameters for a Floating Breakwater
The U. S. Army Engineer Research and Development Center is in the process of developing a Rapidly Installed Breakwater System (RIBS) for use in Joint Logistics Over the Shore Operations...

In Situ Behavior of Breakwaters in Constantza Port?Romania
In order to build breakwaters, especially in the areas with heavy storms, a special analysis on the several factors is necessary. In addition, surveillance of time behavior of breakwaters...

Montioring and Modeling of Tandem Breakwater System at Hammond, IN
A tandem breakwater system was constructed in 1989-90 to provide protection for a large marina at Hammond, IN, at the south end of Lake Michigan. A five year monitoring program (1993-98),...

Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...

Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...

Advances in Buoy Technology for Wind/Wave Data Collection and Analysis
Considerable advances have been made recently to reduce the cost of gathering meteorological and oceanographic data from coastal waters, especially for meteorological and oceanographic...

 

 

 

 

Return to search