Getting Along: The Geotech and the CM
The opinions of geotechnical engineers are usually respected within a consulting firm, but when such a specialist gets out in the field, he or she is seen as merely part of the backup...
Pioneer Highway
The 1993 Outstanding Civil Engineering Achievement Award goes to the $490 million I-70 Glenwood Canyon in Colorado. The final link in Interstate 70 from Baltimore, Md. to Cove Fort, Utah,...
Parameter Estimates for a Groundwater Model
This paper presents a parameter sensitivity study of a two dimensional flow and transport model of a contaminated site. Hydrogeological and site data from previous investigations were...
Optimization Modeling for Sedimentation in Alluvial Rivers Considering Uncertainties
A nonlinear optimization model is formulated for determining optimal reservoir releases to minimize channel bed aggradation and degradation in downstream rivers. The model is based upon...
Reducing the Potential Downstream Impacts of a Dam Failure
The dam safety regulations imposed by the individual states in the United States vary widely and provide inconsistent protection for the citizens of different states. The proximity of...
The Coyote Dam Outlet Works Replacement Project: Hazard Reduction
The Santa Clara Valley Water District's Coyote Dam faced three major concerns: siltation of the existing outlet; a fault that crosses the existing outlet pipe; and the dam toe and the...
Hydraulic Performance of Culvert End Sections Designed for Collision Safety
A type of end section for pipe culverts that was designed for collision safety has some favorable hydraulic characteristics. These safety end sections are long and narrow with large steel...
Surface Flows Over Intertidal Marshes
A marsh-flow measuring device has been designed to quantify the flow across the marsh surface. The fluorometric technique by tracking the visible substance (Rhodamine red dye) applied...
Dam Safety Modifications for Clear Creek Dam Manuscript for ASCE Hydraulics Division 1993 National Conference on Hydraulic Engineering
Clear Creek Dam, an unsafe thin arch dam, was stabilized by constructing a concrete gravity buttress on the downstream face. During the Bureau of Reclamation's (Reclamation) Safety Evaluation...
Bartlett Dam Fuseplug Auxiliary Spillway
Bartlett Dam is located approximately 77 km northeast of Phoenix, Arizona on the Verde River. The Bureau of Reclamation (Reclamation) has determined that the structure is not capable of...
Current Legal Issues in Sedimentation
This paper represents the updating of Chapter 7 for Manual 54. There has been considerable change in legal rulings and precedent law since the first edition of Manual 54. Many of these...
Updating Chapter II?Sediment Transportation Mechanics
Chapter II, the most comprehensive chapter of the Sedimentation Engineering Manual, has aged. The manual prepared by the Task Committee for the Manual on Sedimentation was published by...
Scour Analysis at Highway Structures
ASCE Manual 54 entitled, `Sedimentation Engineering' is being revised. In the revision, a chapter on `Scour at Highway Bridges' will be included. This paper will describe in general terms...
The Dam Safety Process
A safe dam is one which performs its intended functions without imposing unacceptable risks to public safety, property, and welfare by its presence. Ensuring the safety of a dam requires...
Modeling the Fate and Transport of Toxic Heavy Metals in South San Francisco Bay
A two-dimensional vertically-averaged finite element model for the fate and transport of cohesive sediments and associated toxic heavy metals was utilized to predict the spatial and temporal...
Bureau of Reclamation Downstream Hazard Classification
An overview of the downstream hazard classification process used by the Bureau of Reclamation (Reclamation) and other U.S. Department of the Interior (DOI) agencies for the safety of dams...
Using Threat to Life Studies to Guide Dam Safety Decisions
Ensuring that Bureau of Reclamation (Reclamation) dams do not present unacceptable risks to public safety, prosperity, and welfare serves as a primary objective of Reclamation's Safety...
Economic Aspects of the Bureau of Reclamation Safety of Dams Program
The paper briefly examines economic aspects of the Bureau of Reclamation (Reclamation) Safety of Dams (SOD) program evaluation process. Procedures described include the downstream damage...
Emergency Action Plan
Although most dam owners have a high level of confidence in the structures they own and are certain their dams will not fail, the Bureau of Reclamation (Reclamation) included, history...
Incipient Motion in Gravel-Bed Rivers
Incipient motion processes are reviewed for bed material in gravel-bed rivers. Prediction difficulties are identified. Research results are reported for field and flume studies to investigate...
Return to search