Building the Seven Seas
The Brookfield Zoo's Seven Seas Complex, outside of Chicago, is a combination of the Caribbean and the Pacific Northwest. Completed in May 1987, the Seven Seas Complex consists...

An Investigation of the Supports of a Water Main
Two 48 inch (1. 22 m) diameter cast iron pipes constructed 50 to 70 years ago form a major part of the potable water transmission system of Atlantic City. For the most part of their length,...

Monitoring of a Gas Main During Construction
This paper focuses on the task of formulating and implementing a viable plan for protecting an existing gas main located in a construction site where construction activities include excavation,...

Planning for Rehabilitation?MWRA Waterworks System
The Massachusetts Water Resources Authority (MWRA) operates and maintains 255 miles of large diameter distribution mains. Existing problems include increasing steel pipe repairs and extensive...

Cables in Trouble
Having inspected more than half of the world's cable stayed bridges, the authors conclude that many are in danger of sudden collapse unless corrosion problems can be stopped....

Design/Construct Contract Speeds Bridge Job
In the name of time and money savings, Pennsylvania DOT is building a bridge using a modified turnkey contract. In contrast, the standard approach is first to design the bridge, then ask...

Rehabbing the Underground Railroad
The Park Ave. Railroad Tunnel brings three commuter rail lines into New York City's Grand Central Station. The four tracks occupy three tubes from 97th St. to 57th St., where...

Cable Stayed Bridges
Two of these five papers on cable-stayed bridges deal with wind analysis. One develops the theory for motion due to flutter and reaches the conclusion that the vibrations are, in general,...

Soil Properties Evaluation from Centrifugal Models and Field Performance
The performance of geotechnical projects is dependent upon the appropriateness of the design theory to the boundary conditions, and the characterization of the soil properties used in...

Composite Construction in Steel and Concrete
Composite steel-concrete systems are used extensively for buildings, bridges, and other civil engineering structures. Research and development related to composite construction are in...

Transit Triumph
The 1988 Outstanding Civil Engineering Achievement is Boston's Southwest Corridor, chosen not only for its size, complexity and technology, but for its environmental, public...

Guide for Design of Steel Transmission Towers
ASCE Manual 52, Guide for Design of Steel Transmission Towers, serves as a basis for the design of both guyed and self-supporting steel transmission...

Designng to a Fault
Engineers designed a $30 million expansion of one of the Port of Los Angeles' busiest shipping terminals for a site sitting over the Palos Verdes Fault. Because closing the...

The Eccentric Entrance
Architects design irregularly shaped buildings to give their clients something different, and this creates problems for structural engineers, especially in earthquake zones. The Brinderson...

Tied Arch Substitute
When the Minnesota DOT decided to build a new bridge to replace St. Paul's historic High Bridge over the Mississippi, a citizen's advisory group insisted that...

Weathering Steel: Industry's Stepchild
Improper location and poor detailing are two reasons why some weathering steel bridges are not living up to their early promise. That was the consensus reached during a July 1988 forum...

A Safe Skyscraper For the Seismic City
When completed in late 1989, the 73-story First International World Center will be the tallest office building in Los Angeles. The steel structure of the building was designed to be ductile...

Structure as Architecture
The newest structure at Tampa International Airport in Florida is Airside F, part of an expansion of the first airport designed so that passengers are shuttled via monorail between a main...

The Precast Pier
For the U.S. Navy's Strategic program, a 1,410 ft long pier was constructed on New York City's Staten Island. The combined efforts of three engineering firms,...

Caissons Skirt a Tunnel
Exchange Place Center is a 490 ft, 30 story office tower built directly over the existing transportation hub in Jersey City, N.J., where trains and buses meet the PATH Tubes that carry...

 

 

 

 

Return to search