Calibration of a Movable Bed River Model
This paper discusses the calibration procedures used for a model study of three miles (5km) of the Arkansas River. A hydro-power station will be added to an existing Corps of Engineers...
Compendium of International Ocean Energy Activities
This
Electricity From Air
After a decade of research and dozens of feasibility studies at sites around the country, the first Compressed Air Energy Storage (CAES) plant in the U.S. is under construction at McIntosh,...
Power Without Acid
Anticipating tighter acid rain controls, DOE is developing duct injection units that can be attached to existing powerplants. In a typical duct injection system, lime is sprayed into existing...
Top Projects for 1989
Transportation-related projects, most notably bridges, dominate the 1989 OCEA projects, but each of the 11 improved the quality of life of people in the community without harming the environment....
Routing a Cold Water Release Through TVA Reservoirs to Control Intake Temperatures at a Power Plant
A volume of cold water was routed some 160 miles through the TVA reservoir system to keep a nuclear plant intake temperature within safety limits. Mathematical modeling of the operation...
Effects on Reservoir Water Quality Caused by Changes in Inflow Plume Hydrodynamics
In this paper, the effects of environmental changes on the hydrodynamic behavior of the Las Vegas Wash inflow into Lake Mead are discussed from the view-point of water quality. It is hypothesized...
Hydraulic Transient Analysis of High-Head Hydropower Project
An iterative computer simulation procedure called LIQT (Liquid Transient), which performs simulations of hydraulic transients in closed conduit hydro-power systems, is used to estimate...
The Colorado River Simulation System
The Colorado River Simulation System (CRSS) is a comprehensive computer tool designed to assist water resource managers in long-range planning and management of the Colorado River Basin....
Design and Operation of Guard Gates
Guard gates for hydroelectric intakes and low-level outlets are normally intended for operation only under balanced heads. In the case of failure of regulating gates, the guard gate may...
The Estimation of Extreme Floods in Brazil
In Brazil, the design flood of a large dam is calculated using either the Probable Maximum Flood criteria or the 10,000-year Flood. Recently a Guidebook has been written to help Brazilian...
Optimal Interpolation of Bathymetry in the Thyrrehnian Sea
The bathymetry of the Tyrrhenian Sea in the area facing the electro-nuclear plant being built at Montalto di Castro, Italy, is reconstructed with the aid of the constrained kriging making...
Underwater Tunnel Inspection by Virginia Power Using a Submersible Robot
The Bath County Pumped Storage Station, has three large tunnels linking the upper and lower reservoirs. The 'Hydrover' submersible remotely operated vehicle (ROV)...
Glacial Basin Flow for a Power Operation Model
A power operation model was developed and used to estimate the project energy generation and reservoir level fluctuations. In order to precisely simulate the daily project operation, daily...
Localized Mixing for Improvement of Hydropower Releases from J. Percy Priest Reservoir
The J. Percy Priest Project, located on the Stones River near Nashville, TN, experienced low dissolved oxygen (DO) in the tailwaters during hydropower generation. Using commercially available...
Debris Torrents in Nepal and Use of Reliability Engineering Concepts During Redesign of River Works
Debris torrents, generated by cloudbursts and by glacier lake outbursts, occur frequently in the Nepal Himalaya. A simple fault tree analysis is applied to the destruction of a diversion...
The Hydro Business: 1990 and Beyond
During the last ten years, hydroelectric generation received more and more attention as a source of reliable and economical electricity. Since the first WATERPOWER conference, the industry...
Status of Hydropower Development at Corps of Engineers Dams
The Corps of Engineers is the largest single supplier of hydroelectric power in the United States with 74 projects and an installed capacity of 20,839 MW. In addition, 33 Corps projects...
The Development and Writing of the ASCE/EPRI Hydroelectric Guidelines
In the Spring of 1989, the American Society of Civil Engineers (ASCE) and the Electric Power Research Institute (EPRI) jointly published their Civil Engineering Guidelines for Planning...
Project Evaluation?Don't Miss the Boat
The hydroelectric developer is faced with many decisions during the evaluation stage. These include determining the size of the project, financial analysis to be used, type and number...
Return to search