Pipe Jacking Advances
Pipe jacking is the remote placement of pipes underground by means of a tunneling machine that carries a train of pipe behind it. This is a relatively new technology in the United States,...

Renewing San Diego Pumping Station No. 64
Pump Station 64 has experienced a number of sewage overflows into Penasquitos Lagoon since 1979 (57 in total). The California Regional Water Quality Control Board (CRWQCB) issued a Cease...

Manhole Junction Flow
When a sewer surcharges, a basement floods, or sewage overflows, the likeliest source of the problem is sewer junction manholes. Poorly designed ones act as bottlenecks. Study of a few,...

Earthquake Response of La Villita Dam
Due to the recent industrial and housing developments at the port of Lazaro Cardenas, located 13 km (8 miles) downstream of La Villita Dam, at the mouth of the Balsas River, the hazard...

Analyses of Foundation Failures
During the earthquake of September 19th, 1985, many buildings tilted and underwent settlements, sometimes of very large magnitudes. This paper describes and analyzes these settlements....

Soil-Structure Interaction in Mexico City During the 1985 Earthquakes
The effects of the flexibility of the soil and the foundation on the seismic response of structures, by opposition to clear foundation failures, cannot be easily identified from a simple...

Implications of Structural Characteristics on Failure
Performance of buildings with two common structural types, many of which suffered heavy structural damage or collapse, are analyzed. Conclusions are drawn that no structural type is inadequate,...

Stopping Seepage
The Navajo Dam in New Mexico has major seepage problems. The Bureau of Reclamation, which owns the Dam, conducted studies, verified by outside consultants, concluding that the combination...

Dispersive Soil and its Influence on the Design of Reach 1A of the Tucson Aqueduct?Central Arizona Project
An extensive geotechnical field exploration and laboratory testing program was conducted because of dispersive and erosive soils along the alignment of the canal. The canal design was...

St. George Harbor?A Berm Breakwater Solution in Alaska's Bering Sea
The berm breakwater concept is based on the premise that locally available materials should be used in breakwater construction to the largest degree possible. By looking at failure dynamics...

Natural Stabilization of an Eroded Permafrost Site
The paper referred to in this abstract discusses the erosional processes during and after the initial failure, proposed solutions to repair and stabilize the site, and details of the performance...

Building Around a Building
Many, maybe most, construction disasters occur as the result of the failure of temporary structures. Despite the fact that temporary structures have a critical effect on the speed, safety...

California's Fourteen Years of Coastal Zone Management
California's Coastal Zone Management Program has been considered the flagship of the nation; yet large questions remain as to whether the program can protect California's...

Erosion of the Slopes of Gold Tailings Dams
A study has been made of rates of erosion from the slopes of gold-residue dams in the South African Highveld region. Data is available for two years at this time and conclusions must therefore...

Hazardous Waste Landfill Cap System Stability
Pursuant to the regulatory requirements for control of rainfall infiltration into a hazardous waste landfill, a cap design that is impervious plus stable is required. The intent of a cap...

Temporary Structures in Construction Operations
Temporary works have a primary influence on the quality, safety, speed and profitability of all construction projects. They provide access, support and protection of a facility under construction....

The Mexico Earthquakes?1985
Factors Involved and Lessons Learned
This publication reports initial results of study of the 1985 Mexico earthquake, one year after the event. The findings present sufficient depth of analysis to provide an understanding...

Investigating Failure
Failure investigations can be adversarial or cooperative, but impartiality, good engineering ethics, and professional responsibility require that the investigator begin with no premature...

Predicting Equipment Failure
At Cleveland's Westerly Water Pollution Control Center, the physical/chemical plant for treating wastewater is one of the largest of its kind, with 50 mgd average capacity....

Pipelines for Flexible Deliveries
The use of pipelines facilitates flexible deliveries for projects and flexible distribution on the farm. Pipelines have the advantage relative to canals in that they do not have to follow...

 

 

 

 