Sequential Earthquake Response of an Earth Dam
Sequential earthquake-response records of the well-instrumented Long Valley earth dam (Mammoth Lake area in California) are analyzed and engineering interpretations are made. The dam,...

Evaluation of Building Response Recorded During the Morgan Hill Earthquake
On April 24, 1984, the Morgan Hill Earthquake (Richter magnitude 6. 2) occurred within approximately 15 km of IBM Corporation's computer-equipment manufacturing facility located...

A Critical Look at Building Instrumentation in Earthquake Engineering
This paper discusses different issues and requirements existing in the area of building instrumentation. Strategies and types of equipment currently being used by the United States Geological...

Dynamic Testing of Structures Using the RESCUE Technique
This paper describes the most recent phase of an NSF supported program at SRI International to develop the technique of repeatable earth shaking by controlled underground expansion (RESCUE)...

Building Records from 1984 Morgan Hill Earthquake
The dynamic response of 23 structures instrumented by the California Strong Motion Instrumentation Program was recorded during the magnitude 6. 2 (ML) Morgan Hill earthquake of 24 April...

Performance of an Earthquake Excited Roof Diaphragm
The objective of this paper is to study the earthquake performance of the roof diaphragm of the West Valley College gymnasium in Saratoga, California through a complete set of acceleration...

Carnation Terminal, Oakland?Preliminary Design
The Preliminary Design process is examined as it was applied to design of wharves for a new container terminal in the Port of Oakland, California. The process includes active interdisciplinary...

Port of Long Beach Supertanker Terminal
The supertanker marine terminal and crude-oil transfer facility at Berth 121 on Pier E in the Port of Long Beach, California is the largest tanker-handling berth on the West Coast. This...

The Pacific Texas Pipeline Project?Deepwater Oil Terminal, Port of Los Angeles
This paper describes the implementation program and status of the Pacific Texas Pipeline Company project in the Port of Los Angeles. A brief description of this important 1. 6 billion,...

Prestressed Concrete Piling?Design vs. As-Built
The proper design, manufacture, handling and installation of prestressed concrete piles is essential to their structural integrity and long life. A quality control program must be designed...

Fisherman's Wharf Breakwater Design and Construction
Fisherman's Wharf Breakwater is a precast prestressed concrete structure presently under construction. It consists of vertical sheet piles braced at the top by batter piles....

Container Wharves Supported on All Vertical Piles Embedded in Rock-Fill Dikes
In recent years, several container wharves have been planned and/or constructed which feature the construction of the wharf over a sloping rock-fill dike. The wharves utilize all vertical...

Los Angeles and Long Beach Harbors Tidal Circulation Study
Expansion of harbor facilities frequently involves placement of additional landfill and the deepening of channels and mooring areas. A numerical tidal circulation model was used in the...

Marginal Wharf and Embankments?Seismic Design
This paper presents some of the seismic considerations used for the improvements at Berths 225 to 229 at the Port of Los Angeles. The design of the improvements was complicated by the...

Uplist Capacity of Pile Foundations Using CPT Data
Southern California Edison Company has performed field uplift load tests on concrete driven piles, cast-in-place straight shaft piles and cast-in-place belled piers along transmission...

Interpretation of CPT Data for Design of Earth Dams Near Tehachapi, California
The Static Cone Penetration Test (CPT) was used to obtain needed geotechnical information for design and construction of two small earth dams near Tehachapi, California. The basic CPT...

Comprehensive Odor Control Programat East Bay Municipal Utility District (SD-1)
An odor control study was performed in a wastewater treatment plant in California to evaluate the interactive role of various factors tailored to site specific conditions. The scope of...

Controlling Sulfide Corrosion in Large Diameter Gravity Sewers (abstract)
The County Sanitation Districts of Los Angeles County undertook a major evaluation of sewer system ranging in size from 1. 22 to 3. 65 meters in diameter that transports peak wastewater...

Engineering Methodology for Delineating Debris Flow Hazards in Los Angeles County
Utilizing historical and field data, elementary geomorphology and simplified hydraulics of debris flows, a mapping strategy has been developed. The delineation procedure includes defining...

Seawater Intrusion in Salinas Valley, California
The rate of intrusion has been estimated to be about 19,000 acre-feet per year. If no action is taken to halt the intrusion, it is projected that in the year 2000 there will be as much...

 

 

 

 

Return to search