Bureau of Reclamation Experience with Innovative Solutions to Increased Design Floods
Over the last several decades advances in the hydrologist's ability to estimate floods have resulted in increases to the design floods for many existing drainages. As with other dams throughout...

Rehabilitation of a Toe Drain
Old or improperly designed toe drains can cause trouble for embankment dams. Toe drains installed without proper filtering can provide an easy course for internal erosion and piping of...

Geotechnical Modifications at Meeks Cabin Dam
This paper presents a summary of the geologic and geotechnical evaluation of a potential piping deficiency identified at Meeks Cabin Dam as well as description of remedial measures and/or...

General Design and Construction Considerations for Remedial Seepage Control
All earth and rock-fill dams are subject to seepage through the embankment, foundation and abutments. Methods for remedial seepage control include storage restriction, grouting, upstream...

Coolidge Dam Abutment Stability and Stabilization
This paper focuses on left abutment stability assessments and stabilization measures at Coolidge Dam, Arizona. Initial assessment of abutment stability was based on limited rock strength...

Conversion of a Concrete Slab and Buttress Dam to a Gravity Dam
The 58-foot high, 425-foot long, Ambursen-type, concrete slab and buttress, Gorge Plant Dam, which has a 120-foot long overflow spillway near the center, was converted to a concrete gravity...

Seismic Stability Modification Designs for Embankment Dams
The Bureau of Reclamation (Reclamation) has recently designed rehabilitations for four embankment dams to ensure their seismic stability. A fifth project is scheduled for construction....

Using Innovative Technologies and Geosynthetics in Embankment Dam Rehabilitations
The ever increasing development and confidence in new and innovative technologies such as geosynthetics, in conjunction with often significant economic advantages, have led designers to...

Seismic Safety Modification of an Old Earthfill Dam
Chollas Dam was built as a water supply reservoir for the City of San Diego. The reservoir is no longer a part of the municipal water system but has been operated since 1966 as a recreational...

Soil Nailing Technique in Tunnel Support
Authors have developed a new pre-lining method (PASS method) in which thin archshell lining is formed ahead of the tunnel face before the excavation to reinforce the ground. This method...

Geometric Design Projects for Highways
An Introduction
This book provides an introduction to geometric design of highways by means of examaples and projects that emphasize basic specifications, approaches to preliminary route selection, alignment,...

Application of Monte Carlo Neutron Photon to Hanford Waste Vitrification Plant Design Analysis
The Monte Carlo Neutron Photon (MCNP) computer program ('MNCP - A General Monte Carlo Code for Neutron and Photon Transport, Version 3A') (in PC and mainframe versions) has been used for...

Installation and Routing of Critical Embedments at the Hanford Waste Vitrification Plant
During the preliminary design phase of the project, a study was conducted to develop concepts for routing embedded piping and conduit between the remote cells and the service corridors...

Mechanical Design of the Storage Tubes in the HWVP Canister Storage Building
Canisters of high-level waste from the Hanford Waste Vitrification Plant (HWVP) will be stored in an adjacent facility, the Canister Storage Building (CSB). The canisters are stored vertically...

Investigation in 3-D of Stress Distribution in a Circular Tunnel and Vertical Emplacement Holes Due to Thermal and Overburden Loading in Tuff
Thermal stress and displacement analysis using two 3-D finite element models, one having a course mesh and one having a highly detailed mesh are presented. Results are compared to those...

Critical Stresses in Nuclear Waste Container Under Normal Handling Conditions
Critical stresses in the pintle, flat tophead, canister shell, the bottom plate and in the weldment of a high level nuclear waste canister are evaluated under a variety of static and dynamic...

Remote Spent Fuel Handling in France at the La Hague Cask Unloading Facility
French policy for the back end of fuel cycle is based on spent fuel reprocessing. Irradiated spent fuels are transferred in casks from the nuclear reactors to the reprocessing plant where...

Conceptual Design of a Monitored Retrievable Storage Facility
In order to achieve timely acceptance of spent nuclear fuel into the federal radioactive waste management system and to limit the amount of additional at-reactor storage capacity that...

A Systematic Human Factors Assessment of a Department of Energy Facility
This paper presents the methodology for conducting a systematic human factors assessment of the as-built configuration of buildings at the Rocky Flats Plant (RFP). In support of this effort,...

Global Approaches for the Nonconvex Optimization of Pipe Networks
Because the pipe network problem is nonconvex, two global search schemes, MULTISTART and ANNEALING, are employed to permit a local optimum seeking method to migrate among various local...

 

 

 

 