Development of Offshore Breakwaters for the Marine Multipurpose Zone Project
Under these circumstances, the ministry of construction of Japan has launched the marine multipurpose zone (MMZ) project,and is promoting the effective use of seashores facing the open...

Development of the Long Caisson Type Vertical Breakwater
The width of the caisson of a breakwater is calculated based mainly on the wave force expected to act on the caisson. IN this calculation, the assumed wave force is the peak wave force...

Ecolocy-Conscious Submerged Breakwater
A submerged breakwater makes incident rough waves small when their heights exceed a certain level on the site, though the other waves lower than the level are not so much affected by the...

Application of Composite Members to Marine Structures in Japan
Composite structures combined steel plates and reinforced concrete with shear connectors have been applied to port and harbor facilities in Japan since the early 1980s.Composite structures...

Improvement of Terminal Reliability and Travel Time Reliability Under Traffic Management
Terminal reliability and travel time reliability of road networks are proposed as new indicators for road network management and construction. First, the significance of road network management...

Alluvial Fan: Subset Definitions
The Flood Control District of Maricopa County, Arizona recently completed a study whose goal was to identify and describe four alluvial fans for instrumentation and long-term monitoring....

Practical Experience in the Probabilistic Based Management of Large Water Resources Systems
Probabilistic tools to assist with the management of large water resource systems in South Africa were developed and applied during the last decade. Acceptance today is not only due to...

Urban Wetlands for Multi-Disciplinary Stormwater Management
The evaluation of a stormwater management wetlands facility, from conceptual planning stages to final construction and operation, involves the interaction of many disciplines and agencies....

Computing in Civil and Building Engineering
This proceeding consists of papers presented at the Fifth International Conference on Computing in Civil and Building Engineering held in Anaheim, California, June 7-9, 1993. The proceedings...

Getting Along: The Geotech and the CM
The opinions of geotechnical engineers are usually respected within a consulting firm, but when such a specialist gets out in the field, he or she is seen as merely part of the backup...

Computer Scheduling and Construction Specs
As recently as the early 1980s, employing computers in critical path method (CPM) scheduling was a formidable decision demanding considerable commitment of time and resources by management....

Short-Span Bridge Solutions
Large bridges get most of the headlines, but the nation's huge network of small bridges (many with spans of less than 25 ft) may be more in need of replacement. Age, corrosion,...

Closing the Loop
The 5.1 mi Cooper River Bridge, the longest in South Carolina, completes the I 526 Mark Clark Expressway around Charleston. It is a two-way, four-lane structure with the capability of...

London Linkage
Although it measures just 1.8 km, the Limehouse Link tunnel in London is both a complex engineering project and a gateway to urban renewal. The link is a $350 million highway tunnel connecting...

Issues in Balancing Environmental Costs and Benefits in Water Resources Planning
Water projects differ in their physical and economic characteristics and their environmental impacts. Many environmental impacts are addressed through project design and these associated...

Simulation of Subsurface Drainage of Highway Pavements
An analysis of the drainage of a pavement system from initial saturation incorporates a realistic assessment of the drainable porosity of the base. This analysis indicates that if a granular...

Design of Riprap Stilling Basin for Overhanging Pipe
The rock rip-rap basin is the most common and economical method of handling the problem of scour at a pipe outlet. The advantage of the method is speed of construction, absence of the...

The Influence of Exposed Footings on Pier Scour Depths
Data compiled from past test efforts are combined in this article with the results of two new flume test studies. The combined material, presented graphically, suggests a method for adjusting...

The Control and Monitoring of Local Scour at Bridge Piers
A series of flume experiments revealed a possible method of reducing local river bed scour at bridge piers, thereby, reducing the risk of bridge failure. Three prototype schemes were installed...

Comparison of Theoretical and Historical Scour
As part of scour assessments at approximately 120 stream crossings on the New York State Thruway, subsurface investigations were performed at all structures and, in some instances, locations...

 

 

 

 