The Electronic Road Pricing System in Hong Kong
This paper addresses the traffic congestion problem and issues relating to the experiment of the world's first pilot scheme on Electronic Road Pricing System in Hong Kong....

Bicycle Access: New Boost for Transit Performance
Bicycle-transit linkage is a highly cost-effective strategy for boosting suburban transit performance and ridership and appears to offer significant potential for reducing transit access...

Infrastructure Management and Planning for the City of Seattle
This paper summarizes the current planning effort that the City of Seattle's Engineering Department (SED) is undertaking for Transportation Infrastructure Management. The...

Innovative Solution for Urban Freeway Reconstruction
Technology which was developed for economic and rapid construction of precast concrete segmental box girder bridges is being utilized to permit the reconstruction of an urban freeway in...

Golden Gate Bridge: Deck Replacement
A major inspection of the Golden Gate Bridge in 1968-69 found the reinforced concrete roadway of the Bridge to have widespread defects and local failures. Further investigations found...

Micros Go Afield
Taking microcomputers into the field is boosting productivity at construction sites and other field offices. Four examples presented in this article include an owner calculating payments...

Research Challenges in Frozen Ground Pile Design
A fairly recent pile design analysis is reviewed. The influence of such factors as temperature, salinity, loading, etc. on frozen ground pile design is pointed out. Since many facets of...

Project Management for the Upper Harlem Electrification Project
The Upper Harlem Electrification Project consists of a 28 mile extension of 700 V. D. C. under-running third (current carrying contact) rail electrification from North White Plains, New...

Standards for Pile Load Tests in Permafrost
A requirement exists to establish standard procedures for conducting pile load tests in permanently frozen soils. The methods outlined in the ASTM Standards for piles in thawed soils do...

Geotechnical Behavior of Underreams in Pleistocene Clay
Enlarged bases are often constructed in cylindrical drilled-and-cast-in-situ foundation elements (footings, bored piles) to increase their capacity. Enlarged bases that are cut mechanically...

Comparison of Caisson Load Tests on Chicago Hardpan
The results from two relatively recent instrumented caisson load tests from different sites on Chicago Hardpan are compared with a 'classic' large scale caisson...

Review of Repeated Axial Load Tests on Deep Foundations
A review of the literature is presented on the axial capacity of deep foundations subjected to repeated loads. Data are summarized on anchors, driven piles, and drilled shafts. In general,...

Highway Noise: FHWA Requirements and Barrier Design
Since 1973, the Federal Highway Administration (FHWA) has required noise studies for nearly all proposed roadways and roadway improvements that receive federal aid. An overview of these...

Lift Bridge looks Like Sculpture
A lift bridge built in 1926 over the U.S. Canal at Kaukauna, Wis. was replaced by a sleek new lift bridge whose sculptured shape encloses all the machinery within welded steel box sections....

Load-Carrying Capacity and Remaining Life of First-Built Composite Girder Bridge in Japan
Kanzaki Bridge, Osaka, Japan, was the first steel-concrete composite bridge built in 1953 to carry the Osaka Prefectural Road over Kanzaki River. The bridge was removed in 1978 after 25...

Timber Bridge Decks
The portion of the nation's 500,000 bridge decks that are made of timber has been declining for years, as the old timber ones on secondary road bridges are rebuilt, in most...

A Road to Recovery
Inspections of the Golden Gate Bridge revealed that the bridge had localized corrosion near its expansion joints, corrosion of its reinforcing steel, and was severely contaminated with...

Yakima Supervisory Real-Time Monitoring and Control System
The Yakima Remote Control System is a case study application of supervisory control and data acquisition (SCADA) concepts for the operation and monitoring of a large water resources project....

Estimating Delays at Navigation Locks
Tow delay is an important component of cost at navigation locks, and delay reduction is a major benefit of lock improvement. Computer simulation is a valuable method of estimating lock...

A Carrying Capacity Study of Hatteras Island
This article summarizes a study done of Hatteras Island, North Carolina, a largely undeveloped and natural barrier island. 'Carrying capacity' means the ability...

 

 

 

 

Return to search