Manholes and Microtunneling
Contractors are for the Oakwood Beach Interceptor Sewer Project, on Staten Island, N.Y., were having difficulty. Glacial tills and a high water table made working 90 ft below the ground...

In Too Deep
Urban excavation is fraught with risks and potential liability for engineers and contractors. Environmental issues (such as Superfund regulations and environmental impact statements),...

Settling Down Easy
In order to more fully participate in the international and Asian Pacific aviation network, it was decided to establish a highly efficient 24-hour a day operation at the New Kansai International...

School Is In Session
Cost overruns, project delays and the city bureaucracy have given school construction a bad reputation throughout the U.S., particularly in urban centers. But as other construction markets...

Winter Sewer Construction in Campbell Lake
This paper discusses the winter construction for replacement of the Campbell Lake portion of the Campbell Creek C-5 Trunk (C-5 Trunk) located in Anchorage, Alaska (see Figure 1). A previous...

Processed-Snow Foundation Design at the Summit of the Greenland Ice Cap
The design and construction of a processed-snow foundation berm for an elevated building located at the summit of the Greenland Ice Cap is described. Weather conditions and design provisions...

Privatization Takes Flight
The number of air travelers in the U.S. is projected to double by early in the next century. Delays have also been mounting rapidly. Major airports around the world are facing the same...

Trouble on the Waterways?
Crumbling highways and bridges can cripple the U.S. economy. A lesser known transportation problem is the condition of our inland waterway system. Waterways are a cost-efficient, environmentally-sound...

The PowerBargeTM for Lock/Dams on Inland Waterways
Following a brief description of the prefabricated floating PowerBarge concept, the range of application and expected cost and time savings is presented. Environmental benefits are described...

Recirculation Piping Replacement Project at Dresden Unit 3
This paper discusses the Recirculation Piping Replacement Project performed at Dresden Unit 3 during 1985 and 1986. It describes several of the technical and administrative problems associated...

Projections for Reduction in Lake Acidification From SO2 Emission Reductions
The Acid Deposition Assessment Model (ADAM) is used to assess the possible range of effects of a national acid rain emission reduction plan on lake chemistry and fish populations in the...

Hydropower in the Upper Ohio River Basin: A Decade of Effort at Risk
The Federal Energy Regulatory Commission (FERC) issued licenses on September 27, 1989 for construction of 16 hydroelectric projects in the Upper Ohio River Basin after up to 8 years of...

Reviewing the History and Activity of FERC
Since passage of the Federal Water Power Act in 1920 (Part I of the Federal Power Act, 16 U.S.C. 791a et seq.), Congress has required those seeking to construct, operate, or maintain hydroelectric...

Environmental Aspects and Compliance Costs of Hydropower Regulation
Recent experiences by American Electric Power with respect to mitigation at hydroelectric project sites on the upper Ohio River indicate that compliance with environmental regulations...

The Changing Legal Structure of Non-Utility Generation in the 1990's
Before actual construction of a small power production or cogeneration facility commences, numerous economic, technical and legal factors have been considered during the planning process....

Facing the 21st Century with an Aging Hydro System
The Tennesse Valley Authority (TVA) has implemented a comprehensive study of their hydroelectric plants in order to extend their service life for the next 50 years into the 21st century....

Brule Project Spillway Rehabilitation and Expansion
Brule Hydroelectric Project is located near Florence, Wisconsin, on the Brule River about 1.5 miles upstream of its confluence with the Michigamme River. The 80 year old dam developes...

Innovative Aspects of the DQE/GPU Project
The DQE-GPU joint project is an endeavor at supplying electricity to its customers in an economically competative way. The project cosists of using existing power stations in the Three...

Vine Street Reborn
Following decades of controversy and a four-year construction effort that threatened to drive both engineers and local motorists crazy, Philadelphia's Vine Street reopened...

A Computerized Completion
The original designers of the 1.6 million sq ft Fillmore Center in San Francisco (its largest mixed-use development project in 20 years) had specified a large amount of steel reinforcement...

 

 

 

 