An Effective Estimate of the Percentage Completion of Construction Projects and Concomitant Progress Payments
This paper will discuss the methods of assistance to contractors in visualizing the effects of variations in the quantities of their work and how to obtain such information effectively....

Filing of Construction Photos Linked with Database
In order to raise the added value of construction information, a filing system of construction pictures is built up and is used theoretically linked with a database. Here, conditions set...

Design Information Hierarchy for Construction Method Selection Process
The Construction Project Planning (CPP) stage is a critical stage for the success of a construction project. This stage lays the framework upon which most of the construction decisions...

Optimum Design Software Package for Shortening Civil Engineering Construction Period
The optimum software package for engineering network has adopted a coverage technology to facilitate an analysis of large-sized projects. This package has the following functions: (1)...

Construction Enterprise Management Computer-Aided Diagnosis Technique
Due to the problem existed in the traditional management consulting of construction enterprise, the author has developed the MCAD (Management Computer-aided Diagnosis) technology which...

Quality Control and Constructability of Slabs on Grade With Expert Systems
Constructability and quality control problems associated with the construction of slabs on grade are many. They vary from problems associated with cracking, scaling, dusting and spalling,...

Design and Construction Support with Object-Oriented Database Kernel Systems
The heterogeneity of tools and their data models in civil engineering is a well known problem. Next generation database technology seeks to offer solutions for the integration of the design...

An OOP Model for Scheduling of Repetitive Projects
Repetitive projects are characterized by the presence of large number of repetitive activities, along with a number of non-repetitive activities. Each of thee two types of activities requires...

Exchanging Layout and Schedule Data in a Real-Time Distributed Environment
Unpredictable site conditions and unforeseen changes in construction work may result in inefficiencies due to a shortage of work space and difficult access to critical areas on site. This...

Real-Time Position Measurement Integrated with CAD-CAE and Related Data Structure Issues
The Civil Engineering Research Foundation (CERF), Bechtel Corp. (Bechtel), Jacobus Technology, Inc (Jacobus), and Spatial Positioning Systems,Inc. (SPSi) have formed the Consortium for...

Three-Dimensional Nonlinear Analysis of a Wooden Structure with Base Subsidence
A heavy rain caused a famous Chinese ancient wooden structure to suffer serious base subsidence. In order to deal with the base subsidence of the valuable structure, a joggle model and...

Numerical Analysis of Membrane Action in Hollow Core Floors
The emphasis of the investigation is on the diaphragm action of precast floor structures. In order to improve existing manual calculation methods a parameter study has been carried out...

Decision Methods for Selecting Earth Retaining Structures
The Bridge Branch of the Colorado Department of Transportation (CDOT) has organized the framework of a formal decision process for retaining wall selection. The process facilitates implementation...

Framework for an Automated Quality Control System in Working Drawing Production
CAD use for the planning, design, construction and operation of buildings continues to expand at a rapid pace throughout the industry. While CAD applications include a variety of uses...

NCHRP Project 12-28(2)A Bridge Management System Software
This paper describes the various features of the bridge management system being developed by NET Corporation as part of a project funded by the National Cooperative Highway Research Program...

Bridge Management System Implementation at CALTRANS
Development of a new generation of Bridge Management System (BMS) capabilities has been a high priority for CALTRANS for the past four years. Although the Department has had a bridge inventory...

A Study on Aseismic Behaviours of Composite Trussed Arch Bridge
Composite trussed arch bridge is a new type bridge structure developed in China recently, It has the following features: good integrality, reasonable inner force distribution, great spanning...

Technology Framework for Computer Integrated Construction
This paper presents a strategy or overall approach to the integration of the design and construction of facilities. This strategy relies on the use of computers to support the members...

Constraint Management in Distributed AEC Databases
Engineering databases can assist in management of massive amounts of design data involved in Architecture-Engineering and Construction (AEC) process. This data needs to be distributed...

Incorporating Weather Effects in Project Simulation
Planning of construction operations and projects must take into account weather conditions and the resulting impacts on the project schedule. Predetermination of weather and its resulting...

 

 

 

 