On-Site Incineration
A variety of equipment is now available for incinerating hazardous wastes in situ. Thermal treatment, compared to land disposal, offers limited liability and immediate destruction. It...

Characteristics of a Structure-Foundation System
The dynamic characteristics of the structure-foundation system of a 1/4 -scale nuclear power plant containment model is studied using seismic records. The model structure is treated as...

Seismic Isolation of Nuclear Plants: A World Overview
The French were first to apply seismic isolation to the design of nuclear structures. Two large Pressurized Water Reactor plants (PWR) were isolated; the two unit Koeberg station in South...

Assessment of Transmission Line Foundations
Electric utilities are faced with the need to build new transmission lines or to upgrade existing lines to meet future demands. Because of economic constraints and the difficulty of obtaining...

Making Amends with Nature
The U.S. salmon population has been decimated in the last half-century, principally because of hydropower. In the nation's focus on alternate and clean energy sources, fish...

Power Pole Foundations in Reclaimed Mining Area
In central Florida, where strip mining for phosphate ore is a primary industry, street surfaces often become rolling because of differential settlement, and electrical transmission poles...

CUFAD: A Computer Program for Compression and Uplift Foundaton Analysis and Design
A research effort within the electric utility industry has focused on unified design methods for axially loaded foundations for transmission line structures. This research has been made...

Selection of Marine Bioindicators for Monitoring Radioactive Wastes Released from Nuclear Power Plants
The Brazilian Nuclear Program comprises the Angra I Nuclear Power Plant, in operational tests; the Angra II Nuclear Power Plant, under construction, expected to be completed in 1992; and...

In Situ Determinations of Dispersion and Transport Parameters at Piraquara De Fora (RJ)?Brazil, With Help of a Fluorescent Dye Tracer
This paper deals with 'in situ' determinations of the transport and dispersion parameters at Piraquara de Fora cove, near the site where the first Brazilian nuclear...

Heavy Metals Pollution Monitoring Through the Critical Pathways Analysis: The Sepetiba Bay Case
The methodology of the critical pathway analysis has been widely employed to monitor the environmental impact of nuclear power plants in the aquatic environment. This methodology has been...

Treatment Plant Modifications to Conserve Energy and Improve Performance
Creative funding along with thorough planning and design contributed to the successful energy conservation program at the Willow Lake Wastewater Treatment Plant, Salem, Oregon. By funding...

Digester Gas Resource Recovery at Phoenix, Arizona
Until July 1986, the digester gas produced at this 150 million gallon per day facility, in excess of what was utilized for heating anaerobic digesters was flared. In 1983, a feasibility...

Continued Development of the Columbia Basin Project?A Status Report
The Columbia Basin Project is located in central Washington State and encompasses approximately 1 million irrigable acres. Water from the project delivery system was first applied in 1952...

Planning for Future Hydroelectric Power: A Myth?
The hydroelectric power industry in the U.S. is authorized and regulated by the Federal Government through the Federal Energy Retgulatory Commission (FERC) under the Federal Power Act....

Development of the Hydro Optimization Management System at Alabama Power Company
Alabama Power Company is an electric utility serving most of Alabama with a generation mix of 65% coal, 18% nuclear, and 17% hydro. A total of 1682 MW hydro generation comes from 14 plants...

Computerized Resource Planning for the Central Valley Project, California
The Central Valley Project (CVP) consists of nine reservoirs and ten powerplants owned and operated by the United States Government. On an average water year basis, the CVP, with a maximum...

Computer Simulation of CVP Power Production for Integration With PG&E's Power System
The Central Valley Project (CVP) has an installed hydropower capacity of over 1800 MW. The project facilities and its preference power customers lie dispersed within the service territory...

California's Adaptable Model for Operations Planning for the State Water Project
Operations of the California Aqueduct, a 440-mile-long feature of the State Water Project (SWP) consisting of canals, pipelines, reservoirs and hydroelectric plants, are planned using...

Probabilistic Dependable Hydro Capacity: Benefits of Synthetic Hydrology
This paper focuses on the benefits of using synthetic streamflows (the 'synthetic hydrology' approach) for determining a probabilistically defined dependable...

Streamflow Forecasting for Hydropower Operations Using Interactive Modeling Systems
This paper discusses the development of the Snake River Forecast Model (SRFM), a streamflow forecasting system for long-range planning and short-range operation of fifteen hydropower projects....

 

 

 

 