Evaluating Mitigative Options for Critical Facilities in Hurricane Prone Regions
This paper describes, and demonstrates the use of, a methodology to evaluate the safety of occupants in structures subjected to hurricane forces. Occupant safety is expressed in terms...

Reliability-oriented Design of Fatigue Experiments
It is well known in the reliability analysis for structural components subjected to cyclic random load that apart from the usually model parameters uncertainties are most important and...

Reliability Revision for Structures in Service
Models of structural reliability are called upon to provide not only initial estimates of safety, but also revised estimates reflecting new information on the structure as it becomes available....

Reinforced Concrete Column Reliability
A method is proposed whereby the reliability is obtained using the stable configuration approach of structural system reliability. The configurations are defined based on imposed strains...

Reliability of Structural Systems With Multiple Limit States
The purpose of this paper is to present a systematic treatment of the reliability of structural systems with multiple limit states. Several performance criteria (e. g. , excessive deflection,...

Dioxin and Resource Recovery
The 1987 ASCE Dioxin and Resource Recovery Symposium was held at the New York Hilton Hotel, New York on February 10, 1987. The conference served as an opportunity to assess the issue of...

Integrated Information System for Traffic Control Device Management
Traffic engineers and planners have the day-to-day responsibility to maintain the safety and operational efficiency of streets and highways in their jurisdictions. Managing traffic control...

Highway Accident Collision Diagrams on a Microcomputer
Collision diagrams of highway accidents are schematic exhibits that illustrate the location of each accident with respect to the highway geometric features. The types of accidents; such...

Highway Safety Analysis and Monitoring
The Highway Safety Analysis and Monitoring (HISAM) software was developed under a Federal Highway Administration research contract and is designed to aid local agencies with data base...

Microcomputers in Traffic Operations and Safety: Implementation Lessons for Small Agencies
This study develops and demonstrates microcomputer software for highway safety and traffic operations which meets the needs of small transportation and public works agencies. The study...

A Data Base System for Hazardous Materials Transportation
This paper reports on a hazardous materials transportation study conducted in Arizona. Two types of surveys were conducted: hazardous waste shipments for 1983 and 1984 compiled from manifests;...

Expert Systems Approach for Analysis of High Hazard Locations
This paper focuses on the detailed analysis of specific highway locations that have been identified as hazardous in the framework of a State Highway Safety Improvement Program (HSIP)....

CAD Generation of Accident Diagrams for Local Agencies
This paper reviews one such issue, safety, focusing on the development of a user-interface with a microcomputer CAD system. With this interface, the system is used to generate collision...

Fail Safe Management
Engineers are increasingly embroiled in cases where failure is defined as improper administration or management of a procedure instead of the collapse of a structure or the failure of...

Taking the Loss Out of Risk
Since Superfund was authorized in 1981 and 22,000 hazardous waste sites put on notice, funds for remedial action have peaked with $20 billion annual clean-up budgets projected. But to...

Strategic Planning and Management Investing in Your Enterprise
Strategic planning and management can be effectively utilized in public enterprises. It can also enhance required planning, programming, and reporting systems and thereby capitalize on...

Changing Stability Criteria: Effect on Older Dams
Many of the dams on the Georgia Power Company system were designed and constructed in the early 1900's. Changes that have occurred in stability criteria since construction...

Dam Safety Rehabilitation at Selected TVA Hydroelectric Projects
In response to President Carter's 1976 memorandum to all Federal agencies with responsibility for dams to develop and implement formal guidelines for dam safety, TVA restructured...

Rapid Filling of Reservoirs
The rate of filling a reservoir, particularly for the first time, is governed by various factors. While economic considerations may favor rapid filling of reservoir to operational levels,...

Safety of Dams Activities in the Bureau of Reclamation Lower Colorado Region
In the Lower Colorado Region of the Bureau of Reclamation (BuRec), there are presently eight BuRec dams and one Bureau of Indian Affairs dam being modified or studied for modification...

 

 

 

 

Return to search