Dike Safety Upgraded with Millions of Square Feet of Fabric
Nonwoven fabrics of two different weights were used in an $80 million dike reconstruction project in southern Florida. Florida Power & Light Company rebuilt the embankment to a...

Japanese Tunnel Design: Lessons for the U.S.
The Japanese construction industry has a great deal to offer regarding designs, methods, and procedures that can efficiently overcome the tough physical and environmental constraints encountered...

The Deep-Shaft Process: Bright Future for Treating High-Strength Wastewaters
A Deep-Shaft wastewater treatment process may reduce by 10 to 30 percent the power requirements and land area needed for a plant. The technique is most attractive for treating high-BOD...

Vacuum Sewers�� the Future for Sewage Collection�
Patented in the 19th Century, vacuum sewers are making a comeback. Vacuum is created and maintained at a central collection station and extended, through a network of collecting pipes,...

List of Sources and Reference Material on Pipeline Design
Sources of information and reference material on pipeline design are listed. The bibliography is compiled for engineers with limited experience in the pipeline field, and the references...

Symposium on Deep Foundations
Twenty-six case histories on the design, installation and performance of deep foundations are included. The emphasis is on testing and field data. Deep foundations are explored in cretaceous...

New Approach to Storm Drainage Pipe Design
Using a recently developed computer program, drainage swales can be designed to provide short-term storage of stormwater. Benefits of this approach to stormwater management include reduced...

Sand to Sandstone: Foundation Strengthening with Chemical Grout
A large school in San Francisco, built in 1930, was in need of structural rehabilitation to eliminate earthquake hazards. Founded on loose, windblown fine sand, the footings were subject...

World's Tallest Offshore Platform Stands in 1025 Ft of Water
During the summer and fall of 1977 and 1978, Shell Oil installed the world's deepest drilling and production platform in water. Located in 1025-ft of water at the Cognac tract...

Jacked Pipe Provides Roof for Underground Construction in Busy Urban Area
Construction of a major underground station for the metro in Antwerp, Belgium was done in a busy downtown area employing a method that virtually eliminated ground subsidence. The method...

Intermediate Service Levels in Water Distribution
This paper is concerned with design standards for secondary water distribution networks. Based on field studies in the Middle East and Africa, mathematical equations were developed for...

TVA Cuts Deep Slot in Dam, Ends Cracking Problem
In 1972, cracking in the concrete dam at TVA's Fontana project embarked TVA on a four-year program of investigation, analysis and repair. Thermal expansion in the downstream...

What Contractors Think About Prefabricated Piping
Among 190 of the largest users of pipe, 77% now use large-scale prefabricated piping. These users report an average saving, using prefabricated pipe versus conventional pipe, of 23%. Before...

Citizen Participation for Successful Village Water Supply
In developing nations, two keys to the success of village water supply projects are citizen planning and the use of the appropriate technology. The two are related. Involvement of citizens...

Reservoir Outlet Extended Above Silt to Prevent Clogging
Accumulation of silt in an on-stream water storage reservoir almost completely buried the concrete tower originally provided as an outlet intake shaft for releasing stored water through...

Proceedings Volume I
Polyphase Flow Transients Pressure Recovery Devices Intake Structures Cooling Water Systems
The papers presented in these proceedings represent a variety of disciplines from many countries. This unique jointing of three major societies has created a collection of papers with...

Mammoth Transshipment Terminal Links Montana Coal to Michigan Power Plant
In 1973 Detroit Edison contracted with the Decker Coal Company for 200 million tons (181 Tg) of Western low-sulphur coal over a period of 26 years to meet its requirement for low-cost,...

Alternatives to End-of-Pipe Treatment
End-of-pipe treatment must be replaced by innovative, in-process changes if industrial plants are to creatively meet the upcoming 1983 EPA pollution control requirements. By-product recovery,...

Minnesota Interceptor Sewer Breaks New Ground
The Beltline Interceptor is a gravity interceptor sanitary sewer which has its outlet in St. Paul and its beginning in White Bear Lake. Major requirements called for a design which would...

An Experience in Standardization of Nuclear Power Plants
This article outlines successful efforts at design of five standardized nuclear units, in four different states in the U.S.A., for a group of five utilities. The Standard Power Block,...

 

 

 

 