In Situ Determinations of Dispersion and Transport Parameters at Piraquara De Fora (RJ)?Brazil, With Help of a Fluorescent Dye Tracer
This paper deals with 'in situ' determinations of the transport and dispersion parameters at Piraquara de Fora cove, near the site where the first Brazilian nuclear...
Heavy Metals Pollution Monitoring Through the Critical Pathways Analysis: The Sepetiba Bay Case
The methodology of the critical pathway analysis has been widely employed to monitor the environmental impact of nuclear power plants in the aquatic environment. This methodology has been...
Treatment Plant Modifications to Conserve Energy and Improve Performance
Creative funding along with thorough planning and design contributed to the successful energy conservation program at the Willow Lake Wastewater Treatment Plant, Salem, Oregon. By funding...
Digester Gas Resource Recovery at Phoenix, Arizona
Until July 1986, the digester gas produced at this 150 million gallon per day facility, in excess of what was utilized for heating anaerobic digesters was flared. In 1983, a feasibility...
Continued Development of the Columbia Basin Project?A Status Report
The Columbia Basin Project is located in central Washington State and encompasses approximately 1 million irrigable acres. Water from the project delivery system was first applied in 1952...
Planning for Future Hydroelectric Power: A Myth?
The hydroelectric power industry in the U.S. is authorized and regulated by the Federal Government through the Federal Energy Retgulatory Commission (FERC) under the Federal Power Act....
Development of the Hydro Optimization Management System at Alabama Power Company
Alabama Power Company is an electric utility serving most of Alabama with a generation mix of 65% coal, 18% nuclear, and 17% hydro. A total of 1682 MW hydro generation comes from 14 plants...
Computerized Resource Planning for the Central Valley Project, California
The Central Valley Project (CVP) consists of nine reservoirs and ten powerplants owned and operated by the United States Government. On an average water year basis, the CVP, with a maximum...
Computer Simulation of CVP Power Production for Integration With PG&E's Power System
The Central Valley Project (CVP) has an installed hydropower capacity of over 1800 MW. The project facilities and its preference power customers lie dispersed within the service territory...
California's Adaptable Model for Operations Planning for the State Water Project
Operations of the California Aqueduct, a 440-mile-long feature of the State Water Project (SWP) consisting of canals, pipelines, reservoirs and hydroelectric plants, are planned using...
Probabilistic Dependable Hydro Capacity: Benefits of Synthetic Hydrology
This paper focuses on the benefits of using synthetic streamflows (the 'synthetic hydrology' approach) for determining a probabilistically defined dependable...
Streamflow Forecasting for Hydropower Operations Using Interactive Modeling Systems
This paper discusses the development of the Snake River Forecast Model (SRFM), a streamflow forecasting system for long-range planning and short-range operation of fifteen hydropower projects....
Computer Simulation of the Long-Term Operation of the Manitoba Hydro System
The System Simulation Model is a deterministic long-term planning model used to simulate reservoir operation and energy allocation in the Manitoba Hydro system. The model uses the method...
Colorado River Microcomputer Model
This paper describes a computer model which simulates the monthly water and power operations of the twelve reservoirs in the Colorado River Basin for a given demand projection in the future....
A Microcomputer Model for Integrated Analysis of Peaking Hydro in a Thermal System
An integrated approach to simulation of a hydro system called HYDROMOD has been developed and used to place a value on additional energy-limited peaking hydro capacity added to a major...
Optimal Operation of Complex Multireservoir Systems
The paper provides brief descriptions of papers presented in two workshop sections, and of discussions on modeling reservoir systems. The sections are on optimal operation of complex multireservoir...
Application of DDDP for Optimal Daily Operation of the Niagara Generating System
This paper describes the application of Discrete Differential Dynamic Programming (DDDP) to determine the optimal operation of Ontario Hydro's Niagara Generating System, on...
Short-Term Hydroelectric Scheduling Model for WAPA
An optimization model, data system, and a series of user-friendly input/output screens (the HYDRopower Optimization Program, HYDROP) have recently been implemented at the Loveland Area...
Optimal Management of Multi-Purpose Reservoirs in a Hydro-Thermal Power System
Proper management of multi-purpose hydro systems requires to take into account the largely stochastic nature of water inflows, electric loads, and water demands, as well as the often conflicting...
TVA Weekly Scheduling Model Application Experience
Development of TVA's Weekly Scheduling Model was completed in 1980. Eight years of experience covering a wide variety of applications has now been accumulated. Since the basic...
Return to search